WELL · 42-067-30559 · DISTRICT 6

Caver #3

Plugged

Cass County · Lake Texarkna (Travis Peak) field  · Vertical

Caver #3 (API 42-067-30559) is a plugged well in Cass County, plugged December 19, 1991, last operated by Newton Corp. The.

The RRC has issued one drilling permit, issued July 16, 1987, permitted to 9,500 ft.

It was permitted by James, T. L. & Company, Inc. and has since transferred to Newton Corp. The on the wellbore schedule.

Completion filings report 5 formation tops, including Ozan, Base Massive Anhyd, Sligo, Buckner.

Operator of record

Newton Corp. The

Permitted by James, T. L. & Company, Inc.; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Nov 5, 2021 · 1 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleNewton Corp. The
Production reportsnone
Latest permitJames, T. L. & Company, Inc.Jul 16, 1987

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,500
total depth, ft
1
permits on file
Jul 16, 1987
last permit issued
Nov 4, 1987
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2008

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 4, 1987
Shut in
—
Plugged
Dec 19, 1991

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Caver O-6-12258Lake Texarkna (Travis Peak)Newton Corp.,the200Jan 1993 – Mar 2008

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
332646-99DrillJames, T. L. & Company, Inc.Jul 9, 1987Jul 16, 1987Sep 30, 19879,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-6-12258————

Formation tops

As filed on W-2/G-1. Subsea from 250 ft elevation.Download CSV →

FormationMD ftSubsea
OzanBASE OZAN2,415-2,165
Base Massive Anhyd5,400-5,150
Sligo6,045-5,795
Buckner8,992-8,742
Smackover9,337-9,087

Perforations

Perforated and open-hole intervals.

FromToType
6,2126,219Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,10312.25680 S
5.56,3008.75565 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 25, 1988Jan 22, 1988—
00Jan 6, 1988Nov 12, 1987Yes
00Dec 19, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/06730559, documented in the API reference.