WELL · 42-067-30721 · DISTRICT 6
Bryans Mill Unit #24
Cass County · Bryans Mill (Smackover) field · Vertical
Bryans Mill Unit #24 (API 42-067-30721) is a plugged well in Cass County, plugged October 30, 2015, last operated by Sulphur River Exploration Inc..
The RRC has issued one drilling permit, issued September 12, 1997, permitted to 11,500 ft.
It was permitted by Shell Western E&P Inc. and has since transferred to Sulphur River Exploration Inc. on the wellbore schedule.
Completion filings report 5 formation tops, including Travis Peak, Cotton Valley, Hansville, Buckner.
Operator of record
Sulphur River Exploration Inc.
Permitted by Shell Western E&P Inc.; the EWA schedule now lists a different operator.
Dallas, TX · P-5 Y, filed Aug 4, 2025 · 107 permits on file · (800) 734-4872
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Sulphur River Exploration Inc. |
| Production reports | none |
| Latest permit | Shell Western E&P Inc.Sep 12, 1997 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,500
- total depth, ft
- 1
- permits on file
- Sep 12, 1997
- last permit issued
- Oct 16, 2003
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1998 THROUGH Oct 2015
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 16, 2003
- Shut in
- —
- Plugged
- Oct 30, 2015
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Bryans Mill Unit G-6-168046 | Bryans Mill (Smackover) | Sulphur River Exploration, Inc. | 1 | 0 | 0 | Jan 1998 – Oct 2015 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 467536-99 | Drill | Shell Western E&P Inc. | Sep 12, 1997 | Sep 12, 1997 | Nov 7, 1997 | 11,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-168046 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 334 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Travis Peak | 7,073 | -6,739 |
| Cotton Valley | 8,305 | -7,971 |
| Hansville | 9,555 | -9,221 |
| Buckner | 9,784 | -9,450 |
| Smackover | 10,300 | -9,966 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,328 | 10,385 | Perforated |
| 10,388 | 10,393 | Perforated |
| 10,401 | 10,415 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 3,000 | 12.25 | 930 S |
| 5.5 | 10,630 | 7.875 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 8, 2006 | Nov 18, 2005 | — |
| 00 | Jun 12, 1998 | — | — |
| 00 | Jun 5, 1998 | Mar 18, 1998 | Yes |
| 00 | May 28, 1998 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-067-30721 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-067-30721 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/06730721, documented in the API reference.