WELL · 42-071-30086 · DISTRICT 3

Howard #6

N

Chambers County · Cotton Lake (Howard No. 2 Sd.) field  · Vertical

Howard #6 (API 42-071-30086) is a well in Chambers County operated by Mcgowan Working Partners Inc., completed June 7, 1970.

The RRC has issued one drilling permit, issued May 17, 1994, permitted to 6,615 ft.

It was permitted by Christeve Oil Company, Inc. and has since transferred to Mcgowan Working Partners Inc. on the wellbore schedule.

Completion filings report 2 formation tops, including Miocene (undifferentiated), Frio.

Its 2 leases have reported 198K barrels of oil and 110K mcf of gas since January 1993, last reporting in July 2026. The leases carry 4 wells, so these are lease totals, not this well alone.

Operator of record

McGowan Working Partners Inc.

Permitted by Christeve Oil Company, Inc.; the EWA schedule now lists a different operator.

Jackson, MS · P-5 Y, filed Aug 4, 2025 · 60 permits on file · (800) 224-4572

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMcGowan Working Partners Inc.
Production reportsMcGowan Working Partners, Inc.through Apr 2026
Latest permitChristeve Oil Company, Inc.May 17, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,615
total depth, ft
1
permits on file
May 17, 1994
last permit issued
Jun 7, 1970
completed
198K
cumulative oil, bbl
110K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 7, 1970
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Howard O-3-9839Cotton Lake (Howard No. 2 Sd.)McGowan Working Partners, Inc.3188K110KJan 1993 – Jul 2026
Howard O-3-22376Cotton Lake (Howard No. 1 Sd.)McGowan Working Partners, Inc.110.3K47May 1994 – Jul 2026

Oil, barrels lease total

Last 12 months 1,989 · prior 12 2,026(-2%)

0100200300202420252026

Gas, mcf lease total

Last 12 months 2,808 · prior 12 2,816(0%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Christeve Oil Company, Inc.Jan 1994 → Dec 1995
  2. 2McGowan Working PartnersApr 1996 → Apr 2000
  3. 3McGowan Working Partners, Inc.May 2000 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
423916-99RecompletionChristeve Oil Company, Inc.May 13, 1994May 17, 1994Mar 24, 19946,615

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-9839————
—— O-3-22376————

Formation tops

As filed on W-2/G-1. Subsea from 28 ft elevation.Download CSV →

FormationMD ftSubsea
Miocene (undifferentiated)MIOCENE1,261-1,233
Frio6,311-6,283

Perforations

Perforated and open-hole intervals.

FromToType
6,3296,332Perforated
6,3346,336Perforated
6,3606,364Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62568012.25450 S
4.56,4547.8751,370 S
4.56,5027.8751,370 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 1, 1994May 12, 1994Yes
00May 23, 1994Jun 16, 1970—
00Jan 12, 1984Jun 16, 1970—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/07130086, documented in the API reference.