WELL · 42-071-31095 · DISTRICT 3

Blanke-Acom Unit #B 2ST

Plugged

Chambers County · Fig Ridge NW. (F-1) field  · Directional · Sidetrack

Blanke-Acom Unit #B 2ST (API 42-071-31095) is a plugged well in Chambers County, plugged October 3, 1986, last operated by Credo Oil & Gas Inc..

The RRC has issued 3 drilling permits (amended once) between 1980 and 2004, permitted to 15,000 ft.

It was permitted by Kerr-Mcgee Oil & Gas Onshore LLC and has since transferred to Credo Oil & Gas Inc. on the wellbore schedule.

Completion filings report one formation top, including Discorbis.

Its lease has reported 12.9K barrels of oil and 31.3K mcf of gas since April 2005, last reporting in December 2011.

Operator of record

Credo Oil & Gas Inc.

Permitted by Kerr-McGee Oil & Gas Onshore LLC; the EWA schedule now lists a different operator.

Beaumont, TX · P-5 Y, filed Dec 3, 1993 · 26 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCredo Oil & Gas Inc.
Production reportsDenbury Onshore, LLCthrough Jan 2010
Latest permitKerr-McGee Oil & Gas Onshore LLCDec 8, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

15,000
total depth, ft
4
permits on file
Dec 8, 2004
last permit issued
Mar 16, 1984
completed
12.9K
cumulative oil, bbl
31.3K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2005 THROUGH Dec 2011

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 16, 1984
Shut in
—
Plugged
Oct 3, 1986

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Blanke-Acom Unit O-3-24704Fig Ridge,nw (Discorbis)Denbury Onshore, LLC112.9K31.3KApr 2005 – Dec 2011

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Kerr-McGee Oil & Gas Onshore LLCApr 2005 → Feb 2006
  2. 2Kerr-McGee Oil & Gas Onshore LPMar 2006 → Mar 2007
  3. 3Denbury Onshore, LLCApr 2007 → Jan 2010

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
554587-98ReenterKerr-McGee Oil & Gas Onshore LLCJun 1, 2005Dec 8, 2004Dec 17, 200411,000
554587-99Reenter · sidetrackKerr-McGee Oil & Gas Onshore LLCDec 8, 2004Dec 8, 2004—11,000
234055-99RecompletionCredo Oil & Gas, Inc.Mar 29, 1984Mar 29, 1984—9,054
96730-99DrillPrudential Drilling CompanyOct 24, 1980Oct 24, 1980Nov 11, 198015,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-24704————

Formation tops

As filed on W-2/G-1. Subsea from 15 ft elevation.Download CSV →

FormationMD ftSubsea
Discorbis10,250-10,235

Perforations

Perforated and open-hole intervals.

FromToType
8,2998,305Perforated
10,16210,180Perforated
10,26610,270Perforated
10,28010,282Perforated
10,28610,288Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3754,37317.753,600 S
9.6259,27512.252,294 S
79,4408.5335 S
2.3759,970——
2.87510,6246.5320 S
9.625———

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 13, 2005May 25, 2005Yes
00Jul 12, 2005——
00May 23, 1984May 7, 1984—
00May 12, 1984May 7, 1984—
00Jan 12, 1984Apr 20, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/07131095, documented in the API reference.