WELL · 42-071-31174 · DISTRICT 3

Gripon, H. A. a/C 1 #37D

N

Chambers County  · Vertical

Gripon, H. A. A/C 1 #37D (API 42-071-31174) is a disposal or injection well in Chambers County operated by Exxon Corp. under an active UIC permit.

The RRC has issued 3 drilling permits between 1981 and 1984, permitted to 3,300 ft.

Completion filings report one formation top, including Chgd. Shallow Sands.

Its lease has reported 284K barrels of oil and 1.42M mcf of gas since January 1993, last reporting in July 2026. The lease carries 24 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

Exxon Corp.

Houston, TX · P-5 Y, filed Jan 3, 2003 · 19,549 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsTexas Petroleum Investment Co.through Apr 2026
Latest permitExxon Corp.Jun 26, 1984
3,300
total depth, ft
3
permits on file
Jun 26, 1984
last permit issued
—
completed
284K
cumulative oil, bbl
1.42M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 24 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Gripon, H. A. a/C #1 O-3-76AnahuacTexas Petroleum Investment Co.24284K1.42MJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 1,531 · prior 12 3,334(-54%)

0200400202420252026

Gas, mcf lease total

Last 12 months 9 · prior 12 1,835(-100%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Jun 2003
  3. 3Texas Petroleum Investment Co.Jul 2003 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
243213-99RecompletionExxon Corp.Jun 20, 1984Jun 26, 1984Jun 24, 19843,300
177362-99RecompletionExxon Corp. - HoustonNov 15, 1982Nov 15, 1982—2,800
110096-99DrillExxon Corp.Mar 2, 1981Mar 2, 1981Mar 22, 19813,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-76————

Formation tops

As filed on W-2/G-1. Subsea from 32 ft elevation.Download CSV →

FormationMD ftSubsea
Chgd. Shallow Sands1,264-1,232

Perforations

Perforated and open-hole intervals.

FromToType
1,6731,678Perforated
2,6732,687Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,03912.25515 S
2.8751,506——
72,7988.75730 S
72,8008.75730 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 29, 1991Jul 22, 1991—
00Dec 19, 1989Nov 30, 1989—
00Feb 25, 1985Jan 15, 1985—
00Feb 6, 1985——
00Jan 12, 1984Mar 14, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
3.73M
bbl, all reported
Oct 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000047093H-1 InjectionActive15,0006001,700–2,800

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/07131174, documented in the API reference.