WELL · 42-071-31382 · DISTRICT 3
White, William C. et AL #1
Chambers County · Vertical
White, William C. ET AL #1 (API 42-071-31382) is a plugged well in Chambers County, plugged November 14, 1982, last operated by Rutherford Oil Corporation.
The RRC has issued 2 drilling permits between 1982 and 1994, permitted to 9,800 ft.
Completion filings report 2 formation tops, including Anahuac, Frio.
Its 2 leases have reported 137K barrels of oil and 950K mcf of gas since May 1994, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Houston, TX · P-5 Y, filed Jul 3, 2024 · 287 permits on file · (713) 622-5555
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | McGowan Working Partners, Inc.through Oct 2025 |
| Latest permit | Rutherford Oil CorporationMar 21, 1994 |
- 9,800
- total depth, ft
- 2
- permits on file
- Mar 21, 1994
- last permit issued
- —
- completed
- 137K
- cumulative oil, bbl
- 950K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 1994 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Nov 14, 1982
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| White, William C. et AL O-3-23750 | Willow Slough,n.(nodosaria 9500) | McGowan Working Partners, Inc. | 1 | 137K | 130K | Dec 1999 – Jul 2026 |
| White, William C. et AL G-3-150126 | Willow Slough,n.(nodosaria 9500) | Rutherford Oil Corporation | 1 | 0 | 819K | May 1994 – Feb 2000 |
Oil, barrels lease total
Last 12 months 483 · prior 12 989(-51%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Rutherford Oil CorporationMay 1994 → May 2005
- 2Acock Operating LimitedJun 2005 → Apr 2008
- 3McGowan Working Partners, Inc.May 2008 → Oct 2025
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 422126-99 | Reenter | Rutherford Oil Corporation | Mar 17, 1994 | Mar 21, 1994 | Apr 24, 1994 | 9,800 |
| 175889-99 | Drill | Sierra Production Co. | Oct 29, 1982 | Oct 29, 1982 | — | 9,012 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-150126 | — | — | — | — |
| — | — O-3-23750 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 17 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,502 | 9,508 | Perforated |
| 9,512 | 9,518 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,001 | 14.75 | 1,400 S |
| 5.5 | 9,639 | 9.875 | 500 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 14, 2000 | Dec 21, 1999 | Yes |
| 00 | Jan 4, 2000 | — | Yes |
| 00 | Aug 8, 1994 | Jun 17, 1994 | — |
| 00 | Jul 27, 1994 | — | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-071-31382 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-071-31382 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/07131382, documented in the API reference.