WELL · 42-071-31803 · DISTRICT 3

Postema #1

Plugged

Chambers County · Angelina N. (Frio 10969) field  · Vertical

Postema #1 (API 42-071-31803) is a plugged well in Chambers County, plugged September 30, 1997, last operated by Hydrocarbon Management Inc..

The RRC has issued 2 drilling permits between 1986 and 1990, permitted to 11,200 ft.

Completion filings report 3 formation tops, including Het, Frio, 10900 Pay Sand.

Its 2 leases have reported 12K barrels of oil and 25K mcf of gas since January 1993, last reporting in October 1997.

Operator of record

Hydrocarbon Management Inc.

San Antonio, TX · P-5 Y, filed Oct 4, 1996 · 3 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHydrocarbon Management Inc.
Production reportsAlegre Energy, Inc.through Apr 1997
Latest permitHydrocarbon Management, Inc.Jun 5, 1990

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,200
total depth, ft
2
permits on file
Jun 5, 1990
last permit issued
Nov 1, 1986
completed
12K
cumulative oil, bbl
25K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 1997

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 1, 1986
Shut in
—
Plugged
Sep 30, 1997

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Postema O-3-20725Angelina, N. (Frio 10500)Hondo Operating, Inc.112K25KJan 1993 – Oct 1997
— O-3-19431——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hydrocarbon Management, Inc.Jan 1993 → Dec 1996
  2. 2Alegre Energy, Inc.Apr 1997 → Apr 1997

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
374051-99RecompletionHydrocarbon Management, Inc.Jun 4, 1990Jun 5, 1990—11,050
320351-99DrillBuchanan, Wayman W.Sep 10, 1986Sep 15, 1986—11,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-19431————
—— O-3-20725————

Formation tops

As filed on W-2/G-1. Subsea from 21 ft elevation.Download CSV →

FormationMD ftSubsea
Het7,345-7,324
Frio8,018-7,997
10900 Pay Sand10,080-10,059

Perforations

Perforated and open-hole intervals.

FromToType
10,49610,500Perforated
10,50610,511Perforated
10,82010,840Perforated
10,84410,850Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.753,47513.51,435 S
7.62510,0259.875495 S
4.511,0506.5350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 18, 1990Jun 21, 1990Yes
00Jul 14, 1990——
00Dec 5, 1986Nov 17, 1986Yes
00Dec 2, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/07131803, documented in the API reference.