WELL · 42-071-31917 · DISTRICT 3

Knowles W. T. #15

WaterY

Chambers County · Anahuac field · Injection  · Vertical

Knowles W. T. #15 (API 42-071-31917) is a well in Chambers County operated by Mcgowan Working Partners Inc., completed March 30, 1998 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued November 27, 1989, permitted to 2,200 ft.

It was permitted by Mcgowan, John W. and has since transferred to Mcgowan Working Partners Inc. on the wellbore schedule.

Its lease has reported 508K barrels of oil and 648K mcf of gas since January 1993, last reporting in July 2026. The lease carries 5 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 1.29M barrels injected in the 12 months reported through October 2025.

Operator of record

McGowan Working Partners Inc.

Permitted by McGowan, John W.; the EWA schedule now lists a different operator.

Jackson, MS · P-5 Y, filed Aug 4, 2025 · 60 permits on file · (800) 224-4572

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMcGowan Working Partners Inc.
Production reportsMcGowan Working Partners, Inc.through Apr 2026
Latest permitMcGowan, John W.Nov 27, 1989

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,200
total depth, ft
1
permits on file
Nov 27, 1989
last permit issued
Mar 30, 1998
completed
508K
cumulative oil, bbl
648K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 30, 1998
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Knowles, W. T. O-3-62AnahuacMcGowan Working Partners, Inc.5508K648KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 12,530 · prior 12 12,746(-2%)

05001K1.5K202420252026

Gas, mcf lease total

Last 12 months 13,573 · prior 12 18,305(-26%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1McGowan Working PartnersJan 1993 → Apr 2000
  2. 2McGowan Working Partners, Inc.May 2000 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
366966-99DrillMcGowan, John W.Nov 27, 1989Nov 27, 1989—2,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-62————

Perforations

Perforated and open-hole intervals.

FromToType
1,6701,893Perforated
1,7002,086Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
304034—
2445029360 S
161,675221,930 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 6, 1998Apr 16, 1998—
00Mar 8, 1990Feb 19, 1990—
00Feb 28, 1990——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

1.29M
bbl, last 12 reported months
45.5M
bbl, all reported
Oct 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000072896W-14 DisposalActive7,0001001,470–2,150

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 1,286,296 · prior 12 1,238,361(+4%)

050K100K150K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/07131917, documented in the API reference.