WELL · 42-071-82021 · DISTRICT 3

Fisher Zadie #1A

Y

Chambers County · Barbers Hill field · Injection  · Vertical

Fisher Zadie #1A (API 42-071-82021) is a well in Chambers County operated by Sandpoint Texas LLC, completed November 30, 1990 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued December 27, 1989, permitted to 4,035 ft.

It was permitted by Summit Resources, Inc. and has since transferred to Sandpoint Texas LLC on the wellbore schedule.

Its lease has reported 15K barrels of oil and 203 mcf of gas since January 1993, last reporting in July 2026. The lease carries 4 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 40 barrels injected in the 12 months reported through October 2025.

Operator of record

Sandpoint Texas LLC

Permitted by Summit Resources, Inc.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Feb 4, 2026 · 1 permits on file · (832) 767-9659

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSandpoint Texas LLC
Production reportsErg Resources, L.L.C.through May 2008
Latest permitSummit Resources, Inc.Dec 27, 1989

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,035
total depth, ft
1
permits on file
Dec 27, 1989
last permit issued
Nov 30, 1990
completed
15K
cumulative oil, bbl
203
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 30, 1990
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Fisher, Zadie O-3-174Barbers HillSandpoint Texas LLC415K203Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Summit Resources, Inc.Jan 1993 → Dec 1995
  2. 2Union Seaboard CorporationJan 1996 → Apr 2004
  3. 3Erg Operating Company, Inc.May 2004 → Dec 2006
  4. 4Erg Resources, L.L.C.Jan 2007 → May 2008

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
367853-99ReenterSummit Resources, Inc.Dec 20, 1989Dec 27, 1989Oct 10, 19904,035

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-174————

Perforations

Perforated and open-hole intervals.

FromToType
2,1202,150Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.75400——
4.52,1706.25541 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 19, 1991Dec 31, 1990—
00Jan 15, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

40
bbl, last 12 reported months
357K
bbl, all reported
Oct 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000073540W-14 DisposalActive3006002,120–2,150

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 40 · prior 12 0

0204020242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/07182021, documented in the API reference.