WELL · 42-073-30809 · DISTRICT 6
Womack-Herring #2
Cherokee County · Percy Wheeler (Travis Peak) field · Vertical
Womack-Herring #2 (API 42-073-30809) is a plugged well in Cherokee County, plugged June 19, 2020, last operated by J-O B Operating Company.
The RRC has issued one drilling permit, issued September 20, 1993, permitted to 9,700 ft.
It was permitted by Samson Resources Company and has since transferred to J-O B Operating Company on the wellbore schedule.
Completion filings report 6 formation tops, including BMA, Rodessa, James Lime, Pine Island.
Operator of record
Permitted by Samson Resources Company; the EWA schedule now lists a different operator.
Shreveport, LA · P-5 Y, filed Mar 4, 2026 · 113 permits on file · (318) 455-7440
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | J-O B Operating Company |
| Production reports | J-O'B Operating Companythrough Dec 2019 |
| Latest permit | Samson Resources CompanySep 20, 1993 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,700
- total depth, ft
- 1
- permits on file
- Sep 20, 1993
- last permit issued
- May 3, 1994
- completed
- 0
- cumulative oil, bbl
- 538K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 1994 THROUGH Jun 2020
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 3, 1994
- Shut in
- —
- Plugged
- Jun 19, 2020
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Womack-Herring G-6-150618 | Percy Wheeler (Travis Peak) | J-O'B Operating Company | 1 | 0 | 538K | May 1994 – Jun 2020 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1J-O'B Operating CompanyMay 1994 → Dec 2019
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 412401-99 | Drill | Samson Resources Company | Jun 3, 1993 | Sep 20, 1993 | Jan 9, 1994 | 9,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-150618 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 364 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| BMA | 7,880 | -7,516 |
| Rodessa | 7,927 | -7,563 |
| James LimeJAMES | 8,320 | -7,956 |
| Pine Island | 8,425 | -8,061 |
| Pettit | 8,550 | -8,186 |
| Travis Peak | 8,665 | -8,301 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,790 | 8,792 | Perforated |
| 8,800 | 8,804 | Perforated |
| 8,888 | 8,890 | Perforated |
| 8,914 | 8,918 | Perforated |
| 8,922 | 8,926 | Perforated |
| 8,992 | 8,994 | Perforated |
| 9,064 | 9,070 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,738 | 12.25 | 526 S |
| 4.5 | 9,696 | 7.875 | 723 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 8, 1994 | Jun 15, 1994 | Yes |
| 00 | Aug 30, 1994 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-073-30809 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-073-30809 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/07330809, documented in the API reference.