WELL · 42-073-30861 · DISTRICT 6

Chris #1

N

Cherokee County · Walkers Chapel (Pettit 8100) field  · Vertical

Chris #1 (API 42-073-30861) is a well in Cherokee County operated by Jandar Exploration L. C., completed January 5, 1996.

The RRC has issued one drilling permit (amended twice), issued September 15, 1995, permitted to 8,535 ft.

It was permitted by East Texas Production Mgt. Inc and has since transferred to Jandar Exploration L. C. on the wellbore schedule.

Completion filings report 10 formation tops, including T Austin Chalk, T/Austin Chalk, B/Austin Chalk, Baustin Chalk.

Its 2 leases have reported 7.49K barrels of oil and 765K mcf of gas since January 1996, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Jandar Exploration L. C.

Permitted by East Texas Production Mgt. Inc; the EWA schedule now lists a different operator.

Tyler, TX · P-5 Y, filed Jun 4, 2026 · 5 permits on file · (903) 658-3939

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJandar Exploration L. C.
Production reportsJandar Exploration, L. C.through Apr 2026
Latest permitEast Texas Production Mgt. IncSep 15, 1995

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,535
total depth, ft
3
permits on file
Sep 15, 1995
last permit issued
Jan 5, 1996
completed
7.49K
cumulative oil, bbl
765K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1996 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 5, 1996
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Chris G-6-169591Walkers Chapel (Pettit 8100)Jandar Exploration, L. C.10549KJul 1998 – Jul 2026
Chris O-6-13735Walkers Chapel (Pettit 8100)Jandar Exploration, L. C.17.49K216KJan 1996 – Oct 1998

Gas, mcf lease total

Last 12 months 9,501 · prior 12 7,017(+35%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1East Texas Production Mgt. IncJan 1996 → Jul 1998
  2. 2Jandar Exploration, L. C.Aug 1998 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
438050-97DrillEast Texas Production Mgt. IncJun 18, 1997Sep 15, 1995—8,535
438050-98DrillEast Texas Production Mgt. IncDec 3, 1996Sep 15, 1995—8,535
438050-99DrillEast Texas Production Mgt. IncJul 20, 1995Sep 15, 1995Dec 13, 19958,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-169591————
—— O-6-13735————

Formation tops

As filed on W-2/G-1. Subsea from 403 ft elevation.Download CSV →

FormationMD ftSubsea
T Austin Chalk3,950-3,547
T/Austin Chalk3,950-3,547
B/Austin Chalk4,000-3,597
Baustin Chalk4,000-3,597
Woodbine4,100-3,697
Massive Anhy.7,440-7,037
Massive Anhydrite (marker)MASSIVE ANHYDRITE7,440-7,037
Rodessa7,470-7,067
James LimeJAMES7,920-7,517
Pettit8,155-7,752

Perforations

Perforated and open-hole intervals.

FromToType
8,2638,267Perforated
8,2838,298Perforated
8,4238,429Perforated
8,4378,441Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,70411326 S
8.6251,704——
5.58,5107.875700 S
5.58,510——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 11, 1998Jul 22, 1998—
00Sep 4, 1998——
00Feb 3, 1998Feb 21, 1996Yes
00Jan 6, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/07330861, documented in the API reference.