WELL · 42-077-31378 · DISTRICT 9

Scaling Ranch -P- #5

Plugged

Clay County · Lazy -B- (Strawn) field  · Vertical

Scaling Ranch -P- #5 (API 42-077-31378) is a plugged well in Clay County, plugged November 3, 2006, last operated by Lindemann Robert Operating.

The RRC has issued one drilling permit, issued April 20, 1979, permitted to 4,700 ft.

It was permitted by Bridwell Oil CO. and has since transferred to Lindemann Robert Operating on the wellbore schedule.

Its 2 leases have reported 96.2K barrels of oil and 4.33K mcf of gas since January 1993, last reporting in July 2026. The leases carry 24 wells, so these are lease totals, not this well alone.

Operator of record

Lindemann Robert Operating

Permitted by Bridwell Oil Co.; the EWA schedule now lists a different operator.

Holliday, TX · P-5 Y, filed Oct 4, 2025 · 9 permits on file · (940) 733-7004

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLindemann Robert Operating
Production reportsLindemann, Robert Operatingthrough Apr 2026
Latest permitBridwell Oil Co.Apr 20, 1979

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,700
total depth, ft
1
permits on file
Apr 20, 1979
last permit issued
Apr 18, 2003
completed
96.2K
cumulative oil, bbl
4.33K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 18, 2003
Shut in
—
Plugged
Nov 3, 2006

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 24 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Scaling Ranch -P- O-13-19084Lazy -B- (Strawn)Bridwell Oil Co.1885.4K4.33KJan 1993 – Jul 2026
Scaling Ranch -P- O-13-30076Lazy -B- (Strawn)Lindemann, Robert Operating610.7K0Oct 2002 – Jul 2026

Oil, barrels lease total

Last 12 months 741 · prior 12 698(+6%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Bridwell Oil Co.Jan 1993 → Apr 2026
  2. 2Stephens & Johnson Operating Co.Feb 2003 → Nov 2004
  3. 3Lindemann, Robert OperatingDec 2004 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
46929-99DrillBridwell Oil Co.Apr 20, 1979Apr 20, 1979—4,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-19084————
—— O-13-30076————

Perforations

Perforated and open-hole intervals.

FromToType
4,4804,512Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62527512.25210 S
2.3754,460——
4.54,6097.875160 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 13, 2003Apr 23, 2003—
00Dec 2, 2002Aug 17, 1979—
00Jan 12, 1984Aug 17, 1979—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

50
bbl, last 12 reported months
76.7K
bbl, all reported
Jun 2006
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000092927H-1 InjectionPlugged Nov 16, 20067502,2404,480–4,518

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 50 · prior 12 0

020406020052006

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/07731378, documented in the API reference.