WELL · 42-077-32619 · DISTRICT 9

Moore #1

Plugged

Clay County  · Vertical

Moore #1 (API 42-077-32619) is a plugged well in Clay County, plugged July 5, 1985, last operated by Lindsay, Robert P..

The RRC has issued 3 drilling permits between 1982 and 1983, permitted to 7,011 ft.

Completion filings report one formation top, including Caddo.

Operator of record

Lindsay, Robert P.

Wichita Falls, TX · P-5 Y, filed Jan 13, 1987 · 33 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitLindsay, Robert P.Nov 8, 1983
7,011
total depth, ft
3
permits on file
Nov 8, 1983
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jul 5, 1985

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
220141-99OtherLindsay, Robert P.Nov 3, 1983Nov 8, 1983—6,100
206580-99OtherToral Petroleum Inc.Aug 1, 1983Aug 19, 1983—4,500
157494-99DrillBarbee, Bill J.Apr 20, 1982Apr 20, 1982—7,011

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
CaddoCADDO CONGL.6,008

Perforations

Perforated and open-hole intervals.

FromToType
6,0086,014Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62561412.25470 S
4.56,1207.875300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 29, 1984Feb 14, 1984—
00Feb 22, 1984Feb 14, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/07732619, documented in the API reference.