WELL · 42-077-32685 · DISTRICT 9
Hodges #6
Clay County · Bellevue SW. (Bryson) field · Vertical
Hodges #6 (API 42-077-32685) is a plugged well in Clay County, plugged April 15, 1998, last operated by Pruitt Oil & Gas.
The RRC has issued one drilling permit, issued June 28, 1982, permitted to 4,900 ft.
It was permitted by Publishers Petroleum and has since transferred to Pruitt Oil & Gas on the wellbore schedule.
Its lease has reported 12.3K barrels of oil and 37.3K mcf of gas since January 1993, last reporting in January 2008. The lease carries 5 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Publishers Petroleum; the EWA schedule now lists a different operator.
Decatur, TX · P-5 Y, filed Mar 2, 2018 · 9 permits on file · (940) 704-1680
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Pruitt Oil & Gas |
| Production reports | Pruitt Oil & Gasthrough Apr 2007 |
| Latest permit | Publishers PetroleumJun 28, 1982 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,900
- total depth, ft
- 1
- permits on file
- Jun 28, 1982
- last permit issued
- Aug 23, 1982
- completed
- 12.3K
- cumulative oil, bbl
- 37.3K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2008
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 23, 1982
- Shut in
- —
- Plugged
- Apr 15, 1998
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hodges O-13-19140 | Bellevue, SW. (Bryson) | Pruitt Oil & Gas | 5 | 12.3K | 37.3K | Jan 1993 – Jan 2008 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Publishers PetroleumJan 1993 → Feb 2000
- 2Pruitt Oil & GasApr 2000 → Sep 2006
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 164905-99 | Drill | Publishers Petroleum | Jun 28, 1982 | Jun 28, 1982 | Jul 25, 1982 | 4,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-19140 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,762 | 4,770 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 695 | 12.25 | 375 S |
| 4.5 | 4,722 | 7.875 | 150 S |
| 2.375 | 4,800 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 23, 1992 | Mar 25, 1992 | — |
| 00 | Jan 12, 1984 | Aug 30, 1982 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-077-32685 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-077-32685 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 600
- bbl, last 12 reported months
- 55.7K
- bbl, all reported
- Jun 1998
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000076635 | H-1 Injection | Plugged May 6, 1998 | 150 | 1,200 | 4,762–4,770 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 600 · prior 12 7,690(-92%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/07732685, documented in the API reference.