WELL · 42-077-33092 · DISTRICT 9
Glasgow B #2
Clay County · Clay County Regular field · Vertical
Glasgow B #2 (API 42-077-33092) is a plugged well in Clay County, plugged August 20, 1993, last operated by Double G Production.
The RRC has issued one drilling permit, issued August 24, 1983, permitted to 1,300 ft.
It was permitted by Telequest Corporation and has since transferred to Double G Production on the wellbore schedule.
Completion filings report one formation top, including Thomas Sand.
Operator of record
Permitted by Telequest Corporation; the EWA schedule now lists a different operator.
Petrolia, TX · P-5 Y, filed Jan 5, 1993
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Double G Production |
| Production reports | none |
| Latest permit | Telequest CorporationAug 24, 1983 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,300
- total depth, ft
- 1
- permits on file
- Aug 24, 1983
- last permit issued
- May 1, 1986
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 1, 1986
- Shut in
- —
- Plugged
- Aug 20, 1993
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Glasgow "B" O-13-23658 | Clay County Regular | Double G Production | 2 | 0 | 0 | Jan 1993 – Aug 2003 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 207011-99 | Drill | Telequest Corporation | Aug 16, 1983 | Aug 24, 1983 | Aug 10, 1983 | 1,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-23658 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 910 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Thomas SandTHOMAS | 1,120 | -210 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 700 | 850 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 1,150 | 6.5 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 20, 1986 | May 19, 1986 | — |
| 00 | Jun 4, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-077-33092 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-077-33092 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 555
- bbl, last 12 reported months
- 1.65K
- bbl, all reported
- Oct 1992
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000059663 | W-14 Disposal | Plugged Aug 31, 1993 | 0 | 350 | 700–850 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 555 · prior 12 865(-36%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/07733092, documented in the API reference.