WELL · 42-077-33360 · DISTRICT 9

Butler #1

Plugged

Clay County · Heape (Conglomerate) field  · Vertical

Butler #1 (API 42-077-33360) is a plugged well in Clay County, plugged September 28, 1985, last operated by Harper Wayne.

The RRC has issued one drilling permit, issued March 8, 1984, permitted to 6,800 ft.

Completion filings report 3 formation tops, including Caddo, Barnett, Ellenburger.

Operator of record

Harper Wayne

Dallas, TX · P-5 Y, filed Dec 5, 2014 · 171 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHarper Wayne
Production reportsnone
Latest permitHarper, WayneMar 8, 1984
6,800
total depth, ft
1
permits on file
Mar 8, 1984
last permit issued
Apr 27, 1984
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 27, 1984
Shut in
—
Plugged
Sep 28, 1985

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
231885-99DrillHarper, WayneMar 7, 1984Mar 8, 1984—6,800

Formation tops

As filed on W-2/G-1. Subsea from 1,062 ft elevation.Download CSV →

FormationMD ftSubsea
CaddoCADDO LIME5,742-4,680
Barnett6,200-5,138
Ellenburger6,498-5,436

Perforations

Perforated and open-hole intervals.

FromToType
5,9255,954Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62526112.25230 sx
4.56,0867.875350 sx

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 6, 1984May 17, 1984—
00Jun 27, 1984May 17, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/07733360, documented in the API reference.