WELL · 42-077-33462 · DISTRICT 9

Rater #2

Plugged

Clay County · Lazy -B- (Strawn) field  · Vertical

Rater #2 (API 42-077-33462) is a plugged well in Clay County, plugged September 9, 1987, last operated by L & M Oil CO..

The RRC has issued one drilling permit, issued July 12, 1984, permitted to 4,990 ft.

Completion filings report one formation top, including Bryson.

Operator of record

L & M Oil Co.

Dallas, TX · P-5 Y, filed May 15, 1990 · 216 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleL & M Oil Co.
Production reportsnone
Latest permitL & M Oil Co.Jul 12, 1984
4,990
total depth, ft
1
permits on file
Jul 12, 1984
last permit issued
Aug 30, 1984
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 30, 1984
Shut in
—
Plugged
Sep 9, 1987

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
244916-99DrillL & M Oil Co.Jul 11, 1984Jul 12, 1984—4,990

Formation tops

As filed on W-2/G-1. Subsea from 1,079 ft elevation.Download CSV →

FormationMD ftSubsea
BrysonBRYSON LIME4,310-3,231

Perforations

Perforated and open-hole intervals.

FromToType
4,4544,460Perforated
4,4884,492Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62530812.25250 sx
4.54,5877.875205 sx

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 4, 1984Sep 6, 1984—
00Sep 15, 1984Sep 6, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/07733462, documented in the API reference.