WELL · 42-077-33485 · DISTRICT 9
Hapgood E-17 #2
Clay County · Hapgood West (Caddo) field · Vertical
Hapgood E-17 #2 (API 42-077-33485) is a plugged well in Clay County, plugged April 21, 2017, last operated by Parnell Operating.
The RRC has issued one drilling permit, issued August 10, 1984, permitted to 6,300 ft.
It was permitted by Maralo, Inc. and has since transferred to Parnell Operating on the wellbore schedule.
Completion filings report 6 formation tops, including Bryson, Strawn, Smithwick, Caddo.
Its lease has reported 12.8K barrels of oil and 18.6K mcf of gas since January 1993, last reporting in August 2017.
Operator of record
Permitted by Maralo, Inc.; the EWA schedule now lists a different operator.
Kamay, TX · P-5 Y, filed Jan 5, 2026 · 1 permits on file · (940) 481-0136
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Parnell Operating |
| Production reports | Parnell Operatingthrough Apr 2014 |
| Latest permit | Maralo, Inc.Aug 10, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,300
- total depth, ft
- 1
- permits on file
- Aug 10, 1984
- last permit issued
- Aug 27, 1984
- completed
- 12.8K
- cumulative oil, bbl
- 18.6K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2017
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 27, 1984
- Shut in
- —
- Plugged
- Apr 21, 2017
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hapgood "E-17" O-13-24634 | Hapgood, West (Caddo) | Parnell Operating | 1 | 12.8K | 18.6K | Jan 1993 – Aug 2017 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Parnell OperatingJan 1993 → Mar 2014
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 248009-99 | Drill | Maralo, Inc. | Aug 3, 1984 | Aug 10, 1984 | — | 6,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-24634 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 894 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Bryson | 5,018 | -4,124 |
| StrawnSTRAWN SANDS | 5,546 | -4,652 |
| Smithwick | 5,876 | -4,982 |
| Caddo | 5,968 | -5,074 |
| Marble Falls | 6,082 | -5,188 |
| Cong. Pay | 6,156 | -5,262 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,156 | 6,164 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 537 | 12.5 | 375 sx |
| 4.5 | 6,274 | 7.875 | 357 sx |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 2, 1984 | Sep 10, 1984 | — |
| 00 | Sep 20, 1984 | Sep 10, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-077-33485 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-077-33485 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/07733485, documented in the API reference.