WELL · 42-077-34591 · DISTRICT 9
Stine #6
Clay County · Clay County Regular field · Vertical
Stine #6 (API 42-077-34591) is a plugged well in Clay County, plugged January 14, 2022, last operated by Genepa Petroleum Company.
The RRC has issued one drilling permit, issued December 3, 1993, permitted to 1,999 ft.
It was permitted by Talon Production, Inc. and has since transferred to Genepa Petroleum Company on the wellbore schedule.
Completion filings report one formation top, including Cisco.
Its lease has reported 3.82K barrels of oil and 44 mcf of gas since January 1993, last reporting in July 2026. The lease carries 6 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Talon Production, Inc.; the EWA schedule now lists a different operator.
Spring, TX · P-5 Y, filed Apr 4, 2026 · 9 permits on file · (281) 466-7509
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Genepa Petroleum Company |
| Production reports | Genepa Petroleum Companythrough Aug 2018 |
| Latest permit | Talon Production, Inc.Dec 3, 1993 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,999
- total depth, ft
- 1
- permits on file
- Dec 3, 1993
- last permit issued
- Dec 13, 1993
- completed
- 3.82K
- cumulative oil, bbl
- 44
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 13, 1993
- Shut in
- —
- Plugged
- Jan 14, 2022
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 6 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Stine O-13-14294 | Clay County Regular | Genepa Petroleum Company | 6 | 3.82K | 44 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Gray, Mark W. Inc.Jun 1993 → Oct 1993
- 2Talon Production, Inc.Dec 1993 → Jan 1995
- 3Crutcher Oil PropertiesFeb 1995 → Aug 1996
- 4B.E.G. ProductionSep 1996 → Apr 2014
- 5Dry Fork Production Co., LLCMay 2014 → Nov 2014
- 6Genepa Petroleum CompanyDec 2014 → Aug 2018
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 418555-99 | Drill | Talon Production, Inc. | Nov 22, 1993 | Dec 3, 1993 | — | 1,999 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-14294 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 885 | 889 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 955 | 6.75 | 125 S |
| 4.5 | 995 | 6.75 | 125 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 3, 2008 | Jun 13, 2008 | — |
| 00 | Feb 17, 1994 | Dec 20, 1993 | — |
| 00 | Dec 27, 1993 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-077-34591 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-077-34591 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/07734591, documented in the API reference.