WELL · 42-077-34631 · DISTRICT 9
Bridwell River Ranch #74
Clay County · B-R-R N. (Strawn Lower) field · Shut IN · Vertical
Bridwell River Ranch #74 (API 42-077-34631) is a well in Clay County operated by Bridwell Oil CO., completed December 13, 1994 and listed as shut in on the RRC schedule.
The RRC has issued 2 drilling permits between 1994 and 2000, permitted to 5,500 ft.
Completion filings report 2 formation tops, including Bryson, Caddo.
Its 2 leases have reported 3.25M barrels of oil and 4.51M mcf of gas since January 1993, last reporting in July 2026. The leases carry 47 wells, so these are lease totals, not this well alone.
Operator of record
Wichita Falls, TX · P-5 Y, filed Nov 4, 2025 · 1,146 permits on file · (940) 632-8246
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Bridwell Oil Co. |
| Production reports | Bridwell Oil Co.through Apr 2026 |
| Latest permit | Bridwell Oil Co.Aug 10, 2000 |
- 5,500
- total depth, ft
- 2
- permits on file
- Aug 10, 2000
- last permit issued
- Dec 13, 1994
- completed
- 3.25M
- cumulative oil, bbl
- 4.51M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Dec 13, 1994
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 47 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Bridwell River Ranch O-13-1458 | Clay County Regular | Bridwell Oil Co. | 41 | 3.21M | 4.45M | Jan 1993 – Jul 2026 |
| Bridwell River Ranch O-13-28670 | B-R-R, N. (Strawn, Lower) | Bridwell Oil Co. | 6 | 43.6K | 61K | Oct 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 24,110 · prior 12 28,112(-14%)
Gas, mcf lease total
Last 12 months 6,611 · prior 12 13,243(-50%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Bridwell Oil Co.Jan 1993 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 498308-99 | Recompletion | Bridwell Oil Co. | Aug 10, 2000 | Aug 10, 2000 | Aug 1, 2000 | 5,070 |
| 428694-99 | Drill | Bridwell Oil Co. | Sep 30, 1994 | Oct 4, 1994 | Nov 17, 1994 | 5,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-1458 | — | — | — | — |
| — | — O-13-28670 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 978 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,720 | 4,736 | Perforated |
| 5,118 | 5,146 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 281 | 12.25 | 160 S |
| 5.5 | 5,308 | 7.875 | 225 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 28, 2000 | Aug 14, 2000 | Yes |
| 00 | Aug 25, 2000 | — | — |
| 00 | Jan 12, 1995 | Dec 28, 1994 | Yes |
| 00 | Jan 3, 1995 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-077-34631 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-077-34631 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/07734631, documented in the API reference.