WELL · 42-077-35046 · DISTRICT 9
Hodges #1H
Clay County · Newark East (Barnett Shale) field · Horizontal
Hodges #1H (API 42-077-35046) is a plugged horizontal well in Clay County, plugged March 30, 2017, last operated by Eog Resources Inc..
The RRC has issued one drilling permit, issued August 22, 2008, permitted to 8,000 ft.
Completion filings report 5 formation tops, including Palo Pinto, Brazos River, Caddo, Marble Falls.
Operator of record
Midland, TX · P-5 Y, filed Jul 4, 2026 · 16,344 permits on file · (713) 594-5431
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | EOG Resources Inc. |
| Production reports | none |
| Latest permit | EOG Resources, Inc.Aug 22, 2008 |
- 8,000
- total depth, ft
- 1
- permits on file
- Aug 22, 2008
- last permit issued
- Sep 10, 2008
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 2008 THROUGH Apr 2017
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 10, 2008
- Shut in
- —
- Plugged
- Mar 30, 2017
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hodges O-13-31330 | Newark, East (Barnett Shale) | EOG Resources, Inc. | 1 | 0 | 0 | Sep 2008 – Apr 2017 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 668367-99 | Drill | EOG Resources, Inc. | Aug 5, 2008 | Aug 22, 2008 | Aug 29, 2008 | 8,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-31330 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,008 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Palo Pinto | 1,864 | -856 |
| Brazos River | 2,901 | -1,893 |
| Caddo | 5,748 | -4,740 |
| Marble Falls | 6,049 | -5,041 |
| BarnettBARNETT SHALE | 6,385 | -5,377 |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,198 | 12.25 | 460 S |
| 5.5 | 6,920 | 7.875 | 400 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 25, 2010 | Jun 12, 2009 | Yes |
| 00 | Jul 13, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-077-35046 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-077-35046 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/07735046, documented in the API reference.