WELL · 42-079-30772 · DISTRICT 8

West Levelland Unit #190

Plugged

Cochran County · Levelland field  · Vertical

West Levelland Unit #190 (API 42-079-30772) is a plugged well in Cochran County, plugged September 11, 2019, last operated by Hilcorp Energy Company.

The RRC has issued one drilling permit, issued June 17, 1977, permitted to 4,950 ft.

It was permitted by Coline Oil Corp. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Its lease has reported 14.1M barrels of oil and 3.22M mcf of gas since January 1993, last reporting in July 2026. The lease carries 361 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Permitted by Coline Oil Corp.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Mar 26, 2026 · 3,454 permits on file · (713) 209-2411

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitColine Oil Corp.Jun 17, 1977

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,950
total depth, ft
1
permits on file
Jun 17, 1977
last permit issued
Jul 30, 2002
completed
14.1M
cumulative oil, bbl
3.22M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 30, 2002
Shut in
—
Plugged
Sep 11, 2019

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 361 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
West Levelland Unit O-11-60190LevellandHilcorp Energy Company36114.1M3.22MJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 179,445 · prior 12 180,775(-1%)

010K20K202420252026

Gas, mcf lease total

Last 12 months 43,331 · prior 12 44,468(-3%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Oct 2004
  3. 3Apache CorporationNov 2004 → Nov 2024
  4. 4Hilcorp Energy CompanyDec 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
1037-99DrillColine Oil Corp.Jun 17, 1977Jun 17, 1977Aug 5, 19774,950

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-60190————
—— O-11-60190————

Perforations

Perforated and open-hole intervals.

FromToType
4,8894,896Perforated
4,8984,910Perforated
—4,910Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62545612.25275 S
5.54,9387.875250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 24, 2005Apr 18, 2003—
00Apr 14, 2004Jun 2, 2000—
00Mar 11, 2004——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
422K
bbl, all reported
Feb 2020
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000057696H-1 InjectionPlugged Sep 20, 20193002,0004,650–5,000

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120192020

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/07930772, documented in the API reference.