WELL · 42-079-30992 · DISTRICT 8

Miller-Wright Unit #1-12

Y

Cochran County · Levelland field · Injection  · Vertical

Miller-Wright Unit #1-12 (API 42-079-30992) is a well in Cochran County operated by Kimbell Operating Company, completed October 26, 1978 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued September 27, 1978, permitted to 5,000 ft.

It was permitted by Texas City Refg. Inc. and has since transferred to Kimbell Operating Company on the wellbore schedule.

Its lease has reported 2.46M barrels of oil and 451K mcf of gas since January 1993, last reporting in July 2026. The lease carries 66 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 78.9K barrels injected in the 12 months reported through February 2026.

Operator of record

Kimbell Operating Company

Permitted by Texas City Refg. Inc.; the EWA schedule now lists a different operator.

Fort Worth, TX · P-5 Y, filed Mar 4, 2026 · 9 permits on file · (214) 725-5777

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleKimbell Operating Company
Production reportsKimbell Operating Companythrough Apr 2026
Latest permitTexas City Refg. Inc.Sep 27, 1978

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,000
total depth, ft
1
permits on file
Sep 27, 1978
last permit issued
Oct 26, 1978
completed
2.46M
cumulative oil, bbl
451K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 26, 1978
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 66 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Miller-Wright Unit O-11-61133LevellandKimbell Operating Company662.46M451KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 32,709 · prior 12 30,559(+7%)

02K4K202420252026

Gas, mcf lease total

Last 12 months 0 · prior 12 1,058(-100%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Kimbell Oil Company of TexasJan 1993 → Jun 1999
  2. 2Kimbell Operating CompanyJul 1999 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
33631-99DrillTexas City Refg. Inc.Sep 27, 1978Sep 27, 1978Oct 13, 19785,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-61133————

Perforations

Perforated and open-hole intervals.

FromToType
4,9154,945Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62546112.25300 S
4.54,9997.875300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Nov 17, 1978—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

78.9K
bbl, last 12 reported months
2.27M
bbl, all reported
Feb 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000025413H-1 InjectionActive6002,3004,750–5,050

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 78,857 · prior 12 62,250(+27%)

05K10K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/07930992, documented in the API reference.