WELL · 42-079-31036 · DISTRICT 8

Miller-Wright Unit #2028

N

Cochran County · Levelland field  · Vertical

Miller-Wright Unit #2028 (API 42-079-31036) is a well in Cochran County operated by Kimbell Operating Company, completed May 18, 1979.

The RRC has issued 2 drilling permits between 1979 and 2007, permitted to 5,021 ft.

Completion filings report one formation top, including San Andres.

Its lease has reported 2.46M barrels of oil and 451K mcf of gas since January 1993, last reporting in July 2026. The lease carries 66 wells, so these are lease totals, not this well alone.

Operator of record

Kimbell Operating Company

Fort Worth, TX · P-5 Y, filed Mar 4, 2026 · 9 permits on file · (214) 725-5777

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleKimbell Operating Company
Production reportsKimbell Operating Companythrough Apr 2026
Latest permitKimbell Operating CompanyJul 16, 2007
5,021
total depth, ft
2
permits on file
Jul 16, 2007
last permit issued
May 18, 1979
completed
2.46M
cumulative oil, bbl
451K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 18, 1979
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 66 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Miller-Wright Unit O-11-61133LevellandKimbell Operating Company662.46M451KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 32,709 · prior 12 30,559(+7%)

02K4K202420252026

Gas, mcf lease total

Last 12 months 0 · prior 12 1,058(-100%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Kimbell Oil Company of TexasJan 1993 → Jun 1999
  2. 2Kimbell Operating CompanyJul 1999 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
638860-99ReclassKimbell Operating CompanyMay 11, 2007Jul 16, 2007Sep 17, 20075,021
42132-99DrillTexas City Refg. Inc.Feb 7, 1979Feb 7, 1979May 7, 19795,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-61133————
—— O-11-61133————

Formation tops

As filed on W-2/G-1. Subsea from 3,700 ft elevation.Download CSV →

FormationMD ftSubsea
San AndresSAN ANDRES PI4,750-1,050
San AndresSAN ANDRES PII4,825-1,125
San AndresSAN ANDRES PIII4,890-1,190

Perforations

Perforated and open-hole intervals.

FromToType
4,8004,810Perforated
4,8454,855Perforated
4,9004,940Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62545712.25300 S
2.3754,883——
4.55,0217.875250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 24, 2010Sep 14, 2010—
00Sep 21, 2010Mar 5, 2007—
00Jun 7, 2007Mar 5, 2007—
00Jan 12, 1984Jun 21, 1979—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
696K
bbl, all reported
Feb 2010
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000025430H-1 InjectionCanceled Nov 1, 20106002,3004,900–4,940

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120092010

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/07931036, documented in the API reference.