WELL · 42-079-31464 · DISTRICT 8
Laney #13
Cochran County · Levelland field · Producing · Vertical
Laney #13 (API 42-079-31464) is a well in Cochran County operated by Formentera Operations LLC, completed September 11, 1981 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued February 17, 1981, permitted to 4,950 ft.
It was permitted by Bryant & White Oil CO. and has since transferred to Formentera Operations LLC on the wellbore schedule.
Its lease has reported 156K barrels of oil and 6.67K mcf of gas since January 1993, last reporting in July 2026. The lease carries 4 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Bryant & White Oil Co.; the EWA schedule now lists a different operator.
Austin, TX · P-5 Y, filed May 4, 2026 · 90 permits on file · (844) 509-5768
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Formentera Operations LLC |
| Production reports | Formentera Operations LLCthrough Apr 2026 |
| Latest permit | Bryant & White Oil Co.Feb 17, 1981 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,950
- total depth, ft
- 1
- permits on file
- Feb 17, 1981
- last permit issued
- Sep 11, 1981
- completed
- 156K
- cumulative oil, bbl
- 6.67K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Sep 11, 1981
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Laney O-11-62773 | Levelland | Formentera Operations LLC | 4 | 156K | 6.67K | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 2,954 · prior 12 2,283(+29%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Bryant & White Oil Co.Jan 1993 → Nov 2012
- 2Trinity Bay Oil & Gas, Inc.Dec 2012 → Sep 2013
- 3Stanolind Operating LLCOct 2013 → Feb 2015
- 4Sogo III LLCMar 2015 → Jul 2017
- 5Stanolind Production LLCAug 2017 → Dec 2020
- 6Slant Operating, LLCJan 2021 → Oct 2023
- 7Formentera Operations LLCNov 2023 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 130516-99 | Drill | Bryant & White Oil Co. | Feb 17, 1981 | Feb 17, 1981 | Aug 24, 1981 | 4,950 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-11-62773 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,900 | 4,940 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 450 | 12.25 | 275 S |
| 2.375 | 4,940 | — | — |
| 4.5 | 4,947 | 7.875 | 1,000 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Nov 13, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-079-31464 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-079-31464 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/07931464, documented in the API reference.