WELL · 42-079-31532 · DISTRICT 8

Northwest Levelland Unit #1

Plugged

Cochran County · Levelland field  · Vertical

Northwest Levelland Unit #1 (API 42-079-31532) is a plugged well in Cochran County, plugged May 3, 2018, last operated by Cfo Resources Inc..

The RRC has issued one drilling permit, issued February 16, 1982, permitted to 5,000 ft.

It was permitted by Tamarack Petroleum Company, Inc. and has since transferred to Cfo Resources Inc. on the wellbore schedule.

Completion filings report 2 formation tops, including San Andres, Pi Marker.

Its lease has reported 120K barrels of oil and 6.21K mcf of gas since January 1993, last reporting in July 2026. The lease carries 10 wells, so these are lease totals, not this well alone.

Operator of record

Cfo Resources Inc.

Permitted by Tamarack Petroleum Company, Inc.; the EWA schedule now lists a different operator.

Corpus Christ, TX · P-5 Y, filed May 29, 2025 · (432) 853-4647

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCfo Resources Inc.
Production reportsCfo Resources, Inc.through Sep 2016
Latest permitTamarack Petroleum Company, Inc.Feb 16, 1982

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,000
total depth, ft
1
permits on file
Feb 16, 1982
last permit issued
Dec 16, 1988
completed
120K
cumulative oil, bbl
6.21K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 16, 1988
Shut in
—
Plugged
May 3, 2018

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 10 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Northwest Levelland Unit O-11-65884LevellandCfo Resources, Inc.10120K6.21KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Tamarack Petroleum Company, Inc.Jan 1993 → Jul 2010
  2. 2Cfo Resources, Inc.Aug 2010 → Sep 2016

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
150827-99DrillTamarack Petroleum Company, Inc.Feb 16, 1982Feb 16, 1982Feb 16, 19825,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-65884————

Formation tops

As filed on W-2/G-1. Subsea from 3,759 ft elevation.Download CSV →

FormationMD ftSubsea
San Andres3,972-213
PI Marker4,550-791

Perforations

Perforated and open-hole intervals.

FromToType
4,8484,878Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62545312.25250 S
2.3754,848——
4.54,8837.8751,350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 31, 1989Jan 12, 1989—
00Dec 4, 1986Apr 16, 1982—
00Nov 20, 1986——
00Jan 12, 1984Apr 16, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

21.1K
bbl, last 12 reported months
491K
bbl, all reported
Feb 2016
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000066579H-1 InjectionPlugged May 24, 20185002,4004,848–4,878

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 21,074 · prior 12 22,875(-8%)

01K2K3K20152016

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/07931532, documented in the API reference.