WELL · 42-079-31578 · DISTRICT 8

Calvin #109

N

Cochran County · Levelland field  · Vertical

Calvin #109 (API 42-079-31578) is a well in Cochran County operated by Monsanto Oil Company, completed November 23, 1983.

The RRC has issued one drilling permit, issued July 27, 1982, permitted to 5,200 ft.

It was permitted by Monsanto Company and has since transferred to Monsanto Oil Company on the wellbore schedule.

Its lease has reported 1.49M barrels of oil and 1.57M mcf of gas since January 1993, last reporting in July 2026. The lease carries 131 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 1.46K barrels injected in the 12 months reported through February 2025.

Operator of record

Monsanto Oil Company

Permitted by Monsanto Company; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed May 15, 1986 · 193 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMonsanto Oil Company
Production reportsVision Oil and Gas LLCthrough Mar 2026
Latest permitMonsanto CompanyJul 27, 1982

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,200
total depth, ft
1
permits on file
Jul 27, 1982
last permit issued
Nov 23, 1983
completed
1.49M
cumulative oil, bbl
1.57M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 23, 1983
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 131 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Calvin-Starnes Unit O-11-64676LevellandVision Oil and Gas LLC1311.49M1.57MJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 3,991 · prior 12 4,581(-13%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1BHP Petroleum (Americas) Inc.Jan 1993 → Apr 1996
  2. 2Stephens, Autry C.May 1996 → Aug 2000
  3. 3Endeavor Energy Resources L.P.Sep 2000 → May 2017
  4. 4Extex Operating CompanyJun 2017 → May 2019
  5. 5Energy Hunter Resources, Inc.Apr 2018 → Jan 2019
  6. 6DP Permian Operator, LLCJun 2019 → Aug 2024
  7. 7Vision Oil and Gas LLCSep 2024 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
167793-99DrillMonsanto CompanyMay 23, 1983Jul 27, 1982—5,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-64676————

Perforations

Perforated and open-hole intervals.

FromToType
5,0745,100Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62545712.25425 S
2.3755,077——
5.55,1207.8751,250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 22, 1984Nov 29, 1983—
00Feb 17, 1984Nov 29, 1983—
00Feb 15, 1984Nov 29, 1983—
00Jan 12, 1984Nov 29, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

1.46K
bbl, last 12 reported months
732K
bbl, all reported
Feb 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000048735H-1 InjectionActive8002,3505,074–5,100

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 1,460 · prior 12 11,801(-88%)

01K2K3K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/07931578, documented in the API reference.