WELL · 42-079-31984 · DISTRICT 8
RJR Ranch 702 #702
Cochran County · Bonanza East (San Andres) field · Vertical
Rjr Ranch 702 #702 (API 42-079-31984) is a plugged well in Cochran County, plugged December 14, 2000, last operated by Steller Energy & Investment Corp.
The RRC has issued one drilling permit (amended once), issued June 26, 1984, permitted to 5,000 ft.
It was permitted by Texland-Rector & Schumacher and has since transferred to Steller Energy & Investment Corp on the wellbore schedule.
Completion filings report 4 formation tops, including Pi Marker, Zone 1, Zone 1a, Zone 2.
Operator of record
Steller Energy & Investment Corp
Permitted by Texland-Rector & Schumacher; the EWA schedule now lists a different operator.
Plano, TX · P-5 Y, filed Jan 8, 2021 · 160 permits on file · (972) 673-1215
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Steller Energy & Investment Corp |
| Production reports | none |
| Latest permit | I.S.R. Exploration, Inc.Jun 26, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,000
- total depth, ft
- 2
- permits on file
- Jun 26, 1984
- last permit issued
- Aug 5, 1984
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2001
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 5, 1984
- Shut in
- —
- Plugged
- Dec 14, 2000
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| RJR Ranch "702" O-11-66242 | Bonanza, East (San Andres) | Steller Energy & Investment Corp | 1 | 0 | 0 | Jan 1993 – Jan 2001 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 243120-98 | Field transfer | Texland-Rector & Schumacher | Aug 12, 1988 | Jun 26, 1984 | — | 4,925 |
| 243120-99 | Drill | I.S.R. Exploration, Inc. | Jun 22, 1984 | Jun 26, 1984 | Jun 26, 1984 | 5,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-11-66242 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,920 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| PI Marker | 4,605 | -685 |
| Zone 1 | 4,764 | -844 |
| Zone 1A | 4,829 | -909 |
| Zone 2 | 4,886 | -966 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,888 | 4,919 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 430 | — | 260 S |
| 8.625 | 430 | 12.25 | 260 sx |
| 5.5 | 4,925 | — | 1,100 S |
| 5.5 | 4,925 | 7.875 | 1,100 sx |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 6, 1988 | Jul 21, 1988 | — |
| 00 | Aug 30, 1988 | — | — |
| 00 | Sep 4, 1984 | Aug 20, 1984 | — |
| 00 | Sep 1, 1984 | Aug 20, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-079-31984 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-079-31984 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/07931984, documented in the API reference.