WELL · 42-079-32064 · DISTRICT 8

Reed Wright B #11

Plugged

Cochran County · Levelland field  · Vertical

Reed Wright B #11 (API 42-079-32064) is a plugged well in Cochran County, plugged July 16, 2013, last operated by Hexp Operating LLC.

The RRC has issued one drilling permit, issued November 2, 1984, permitted to 5,000 ft.

It was permitted by United Company and has since transferred to Hexp Operating LLC on the wellbore schedule.

Completion filings report one formation top, including San Andres.

Its lease has reported 1.57M barrels of oil and 667K mcf of gas since January 1993, last reporting in July 2026. The lease carries 50 wells, so these are lease totals, not this well alone.

Operator of record

Hexp Operating LLC

Permitted by United Company; the EWA schedule now lists a different operator.

Midland, TX · P-5 Y, filed Aug 4, 2025 · 4 permits on file · (432) 661-3573

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHexp Operating LLC
Production reportsHexp Operating, LLCthrough Apr 2026
Latest permitUnited CompanyNov 2, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,000
total depth, ft
1
permits on file
Nov 2, 1984
last permit issued
May 12, 1994
completed
1.57M
cumulative oil, bbl
667K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 12, 1994
Shut in
—
Plugged
Jul 16, 2013

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 50 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Reed Wright "B" O-11-62523LevellandHexp Operating, LLC501.57M667KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 24,933 · prior 12 25,573(-3%)

02K4K202420252026

Gas, mcf lease total

Last 12 months 4,739 · prior 12 2,641(+79%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1AtapcoJan 1993 → Dec 1998
  2. 2Tema Oil and Gas, LLCJan 1999 → Feb 1999
  3. 3Tema Oil and Gas CompanyMar 1999 → Nov 2017
  4. 4Hexp Operating, LLCDec 2017 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
256552-99DrillUnited CompanyOct 24, 1984Nov 2, 1984—5,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-62523————

Formation tops

As filed on W-2/G-1. Subsea from 3,765 ft elevation.Download CSV →

FormationMD ftSubsea
San Andres4,576-811
San Andres4,765-1,000

Perforations

Perforated and open-hole intervals.

FromToType
4,7304,756Perforated
4,8244,830Perforated
4,8554,900Perforated
4,8624,885Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62543813.5250 S
5.54,9687.875250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 29, 1994Jul 29, 1994—
00Feb 19, 1985Feb 8, 1985—
00Feb 15, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
721K
bbl, all reported
Feb 2015
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000080987H-1 InjectionPlugged Aug 16, 20136002,2004,855–4,900

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120142015

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/07932064, documented in the API reference.