WELL · 42-079-33052 · DISTRICT 8

Wright J.M. Unit #36X

Plugged

Cochran County · Levelland field  · Vertical

Wright J.M. Unit #36X (API 42-079-33052) is a plugged well in Cochran County, plugged July 18, 2012, last operated by A.C.T. Operating Company.

The RRC has issued one drilling permit, issued October 24, 2003, permitted to 5,100 ft.

It was permitted by Walsh Petroleum, Inc. and has since transferred to A.C.T. Operating Company on the wellbore schedule.

Completion filings report one formation top, including San Andres.

Its lease has reported 2.09M barrels of oil and 1.72M mcf of gas since September 1999, last reporting in July 2026. The lease carries 99 wells, so these are lease totals, not this well alone.

Operator of record

A.C.T. Operating Company

Permitted by Walsh Petroleum, Inc.; the EWA schedule now lists a different operator.

Lubbock, TX · P-5 Y, filed Jul 4, 2026 · 53 permits on file · (806) 407-6505

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleA.C.T. Operating Company
Production reportsA.C.T. Operating Companythrough Apr 2026
Latest permitWalsh Petroleum, Inc.Oct 24, 2003

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,100
total depth, ft
1
permits on file
Oct 24, 2003
last permit issued
Jan 19, 2004
completed
2.09M
cumulative oil, bbl
1.72M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 1999 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 19, 2004
Shut in
—
Plugged
Jul 18, 2012

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 99 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Wright, J.M. Unit O-11-68120LevellandA.C.T. Operating Company992.09M1.72MSep 1999 – Jul 2026

Oil, barrels lease total

Last 12 months 37,970 · prior 12 40,293(-6%)

02K4K202420252026

Gas, mcf lease total

Last 12 months 2,227 · prior 12 11,410(-80%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Ard Drilling Company Inc.Sep 1999 → Apr 2000
  2. 2Walsh Petroleum, Inc.May 2000 → Dec 2022
  3. 3A.C.T. Operating CompanyJan 2023 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
537741-99DrillWalsh Petroleum, Inc.Oct 21, 2003Oct 24, 2003Dec 3, 20035,100

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-68120————

Formation tops

As filed on W-2/G-1. Subsea from 3,749 ft elevation.Download CSV →

FormationMD ftSubsea
San Andres4,962-1,213

Perforations

Perforated and open-hole intervals.

FromToType
4,9624,982Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62543012.25275 S
4.55,0007.8751,400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 2, 2004Feb 20, 2004Yes
00Jun 4, 2004——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
590K
bbl, all reported
Feb 2013
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000093579H-1 InjectionPlugged Aug 16, 20123502,0004,962–4,982

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 73,040(-100%)

05K10K20122013

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/07933052, documented in the API reference.