WELL · 42-079-33110 · DISTRICT 8

Starnes Ranch 34 #4 H

N

Cochran County · Levelland field  · Horizontal

Starnes Ranch 34 #4 H (API 42-079-33110) is a horizontal well in Cochran County operated by Vision Oil And Gas LLC, completed December 30, 2005.

The RRC has issued 2 drilling permits (amended once) between 2005 and 2007, permitted to 5,100 ft.

It was permitted by Redmon Oil Company, Inc., The and has since transferred to Vision Oil And Gas LLC on the wellbore schedule.

Completion filings report one formation top, including San Andres.

Its lease has reported 202K barrels of oil and 187K mcf of gas since January 1993, last reporting in July 2026. The lease carries 6 wells, so these are lease totals, not this well alone.

Operator of record

Vision Oil and Gas LLC

Permitted by Redmon Oil Company, Inc., The; the EWA schedule now lists a different operator.

Laredo, TX · P-5 Y, filed Feb 4, 2026 · 6 permits on file · (956) 286-0875

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleVision Oil and Gas LLC
Production reportsVision Oil and Gas LLCthrough Oct 2025
Latest permitRedmon Oil Company, Inc., TheJan 25, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,100
total depth, ft
3
permits on file
Jan 25, 2007
last permit issued
Dec 30, 2005
completed
202K
cumulative oil, bbl
187K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 30, 2005
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 6 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Starnes Ranch "34" O-11-66371LevellandVision Oil and Gas LLC6202K187KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 494 · prior 12 272(+82%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Castex Energy, Inc.Jan 1993 → Aug 1996
  2. 2McClure Oil Company, Inc.Sep 1996 → Nov 2004
  3. 3Redmon Oil Company, Inc., TheDec 2004 → Apr 2017
  4. 4Extex Operating CompanyMay 2017 → May 2019
  5. 5Energy Hunter Resources, Inc.Jan 2018 → Feb 2019
  6. 6DP Permian Operator, LLCJun 2019 → Aug 2024
  7. 7Vision Oil and Gas LLCApr 2025 → Oct 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
632307-99RecompletionRedmon Oil Company, Inc., TheJan 22, 2007Jan 25, 2007Feb 8, 20075,100
609023-98DrillRedmon Oil Company, Inc,theAug 30, 2006Nov 7, 2005Dec 6, 20055,100
609023-99DrillRedmon Oil Company, Inc,theNov 4, 2005Nov 7, 2005Dec 6, 20055,100

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-66371————
—— O-11-66371————

Formation tops

As filed on W-2/G-1. Subsea from 3,792 ft elevation.Download CSV →

FormationMD ftSubsea
San Andres4,347-555
San Andres4,374-582

Perforations

Perforated and open-hole intervals.

FromToType
4,8274,839Perforated
5,0615,075Perforated
5,0755,095Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62555512.25325 S
5.55,1157.875600 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 28, 2008Apr 9, 2007—
00Feb 15, 2008May 8, 2006Yes
00Jan 29, 2007May 8, 2006Yes
00Sep 11, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/07933110, documented in the API reference.