WELL · 42-081-30796 · DISTRICT 7

March Ranch #9

Plugged

Coke County · Higgins Ranch (Canyon) field  · Vertical

March Ranch #9 (API 42-081-30796) is a plugged well in Coke County, plugged August 2, 1996, last operated by Mayne & Mertz Inc..

The RRC has issued one drilling permit, issued August 14, 1979, permitted to 6,500 ft.

It was permitted by Texaco Inc. and has since transferred to Mayne & Mertz Inc. on the wellbore schedule.

Its lease has reported 673 barrels of oil and 19 mcf of gas since January 1993, last reporting in October 1996. The lease carries 3 wells, so these are lease totals, not this well alone.

Operator of record

Mayne & Mertz Inc.

Permitted by Texaco Inc.; the EWA schedule now lists a different operator.

Midland, TX · P-5 Y, filed Dec 2, 2016 · 21 permits on file · (432) 528-0347

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMayne & Mertz Inc.
Production reportsMayne & Mertz, Inc.through Nov 1995
Latest permitTexaco Inc.Aug 14, 1979

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,500
total depth, ft
1
permits on file
Aug 14, 1979
last permit issued
Aug 25, 1979
completed
673
cumulative oil, bbl
19
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 1996

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 25, 1979
Shut in
—
Plugged
Aug 2, 1996

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
March Ranch O-9-7976Higgins Ranch (Canyon)Mayne & Mertz, Inc.367319Jan 1993 – Oct 1996

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mayne & Mertz, Inc.Jan 1993 → Nov 1995

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
55461-99DrillTexaco Inc.Aug 14, 1979Aug 14, 1979Aug 14, 19796,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-9-7976————

Perforations

Perforated and open-hole intervals.

FromToType
6,0346,046Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62559411594 S
2.3755,833——
5.56,4906.756,490 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Sep 13, 1979—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/08130796, documented in the API reference.