WELL · 42-081-31163 · DISTRICT 7

Glenn D. K. #5

Plugged

Coke County · Leppart (Palo Pinto) field  · Vertical

Glenn D. K. #5 (API 42-081-31163) is a plugged well in Coke County, plugged July 5, 2002, last operated by Carrland Oil & Gas Inc..

The RRC has issued one drilling permit, issued December 23, 1982, permitted to 5,600 ft.

It was permitted by Coke Oil, Inc. and has since transferred to Carrland Oil & Gas Inc. on the wellbore schedule.

Completion filings report 2 formation tops, including Palo Pinto, Jennings.

Its lease has reported 2.08K barrels of oil and 27 mcf of gas since January 1993, last reporting in August 2003. The lease carries 4 wells, so these are lease totals, not this well alone.

Operator of record

Carrland Oil & Gas Inc.

Permitted by Coke Oil, Inc.; the EWA schedule now lists a different operator.

Prosper, TX · P-5 Y, filed May 4, 2026 · 1 permits on file · (325) 668-4545

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCarrland Oil & Gas Inc.
Production reportsCarrland Oil & Gas Inc.through Nov 1996
Latest permitCoke Oil, Inc.Dec 23, 1982

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,600
total depth, ft
1
permits on file
Dec 23, 1982
last permit issued
Jan 18, 1983
completed
2.08K
cumulative oil, bbl
27
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2003

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 18, 1983
Shut in
—
Plugged
Jul 5, 2002

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Glenn, D. K. O-9-9307Leppart (Palo Pinto)Carrland Oil & Gas Inc.42.08K27Jan 1993 – Aug 2003

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Carrland Oil & Gas Inc.Jan 1993 → Nov 1996

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
182036-99DrillCoke Oil, Inc.Dec 23, 1982Dec 23, 1982Jan 1, 19835,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-9-9307————

Formation tops

As filed on W-2/G-1. Subsea from 1,850 ft elevation.Download CSV →

FormationMD ftSubsea
Palo Pinto4,400-2,550
Jennings4,800-2,950

Perforations

Perforated and open-hole intervals.

FromToType
3,3193,324Perforated
4,4084,416Perforated
4,8174,821Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62522011150 S
4.54,5167.875850 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 23, 1991Nov 27, 1990—
00Jan 17, 1986Jan 3, 1986—
00Jan 15, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
103K
bbl, all reported
Feb 2001
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000064386H-1 InjectionPlugged Jul 18, 20024009003,319–3,324

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120002001

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/08131163, documented in the API reference.