WELL · 42-081-31968 · DISTRICT 7

Ft. Chadbourne Odom Lime Unit #8062

Y

Coke County · Fort Chadbourne field · Shut IN  · Vertical

FT. Chadbourne Odom Lime Unit #8062 (API 42-081-31968) is a well in Coke County operated by L.C.S. Production Company, completed August 13, 2010 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit, issued May 12, 2010, permitted to 6,600 ft.

It was permitted by Enervest Operating, L.L.C. and has since transferred to L.C.S. Production Company on the wellbore schedule.

Completion filings report one formation top, including Odom Lime.

Its lease has reported 1.82M barrels of oil and 29.9M mcf of gas since January 1993, last reporting in July 2026. The lease carries 191 wells, so these are lease totals, not this well alone.

Operator of record

L.C.S. Production Company

Permitted by Enervest Operating, L.L.C.; the EWA schedule now lists a different operator.

Abilene, TX · P-5 Y, filed May 4, 2026 · 1,707 permits on file · (325) 691-1085

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleL.C.S. Production Company
Production reportsL.C.S. Production Companythrough Apr 2026
Latest permitEnervest Operating, L.L.C.May 12, 2010

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,600
total depth, ft
1
permits on file
May 12, 2010
last permit issued
Aug 13, 2010
completed
1.82M
cumulative oil, bbl
29.9M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 13, 2010
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 191 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Ft. Chadbourne Odom Lime Unit O-9-506Fort ChadbourneL.C.S. Production Company1911.82M29.9MJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 157,141 · prior 12 180,292(-13%)

010K20K202420252026

Oil, barrels lease total

Last 12 months 1,921 · prior 12 3,171(-39%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Feb 1993
  2. 2Pittencrieff America, Inc.Mar 1993 → Sep 2001
  3. 3St. Mary Energy CompanyOct 2001 → Oct 2003
  4. 4Mak-J Energy Partners(tx),ltd.Nov 2003 → Jul 2006
  5. 5Enervest Operating, L.L.C.Aug 2006 → Jul 2011
  6. 6Vanguard Permian, LLCAug 2011 → Apr 2015
  7. 7Vanguard Operating, LLCMay 2015 → Aug 2019
  8. 8Grizzly OP of Delaware, LLCSep 2019 → Jul 2020
  9. 9L.C.S. Production CompanyAug 2020 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
695635-99DrillEnervest Operating, L.L.C.May 7, 2010May 12, 2010Jul 14, 20106,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-9-506————

Formation tops

As filed on W-2/G-1. Subsea from 1,981 ft elevation.Download CSV →

FormationMD ftSubsea
Odom Lime5,426-3,445

Perforations

Perforated and open-hole intervals.

FromToType
5,4285,430Perforated
5,4345,446Perforated
5,4595,470Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62528912.25180 S
5.55,6107.875600 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 22, 2011Aug 23, 2010Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/08131968, documented in the API reference.