WELL · 42-081-32005 · DISTRICT 7
Arebalo #1
Coke County · Hunch (Canyon) field · Producing · Vertical
Arebalo #1 (API 42-081-32005) is a well in Coke County operated by Gng Operating LLC, completed October 23, 2011 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued August 25, 2011, permitted to 5,800 ft.
It was permitted by Halvey Energy, LLC and has since transferred to Gng Operating LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Munn Sand, Hunch Canyon Sand, Palo Pinto.
Its lease has reported 5.02K barrels of oil since October 2011, last reporting in July 2026.
Operator of record
Permitted by Halvey Energy, LLC; the EWA schedule now lists a different operator.
Graham, TX · P-5 Y, filed Oct 4, 2025 · (940) 549-0131
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | GNG Operating LLC |
| Production reports | GNG Operating LLCthrough Apr 2026 |
| Latest permit | Halvey Energy, LLCAug 25, 2011 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,800
- total depth, ft
- 1
- permits on file
- Aug 25, 2011
- last permit issued
- Oct 23, 2011
- completed
- 5.02K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2011 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Oct 23, 2011
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Delinquent
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Arebalo O-9-17794 | Hunch (Canyon) | GNG Operating LLC | 1 | 5.02K | 0 | Oct 2011 – Jul 2026 |
Oil, barrels lease total
Last 12 months 12 · prior 12 17(-29%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Halvey Energy, LLCJan 2012 → Aug 2015
- 2Bustamante Oil CompanySep 2015 → Feb 2024
- 3Hatch, Tucker RoyMar 2024 → May 2024
- 4GNG Operating LLCJun 2024 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 722568-99 | Drill | Halvey Energy, LLC | Aug 17, 2011 | Aug 25, 2011 | Oct 13, 2011 | 5,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-9-17794 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,970 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Munn Sand | 5,025 | -3,055 |
| Hunch Canyon Sand | 5,125 | -3,155 |
| Palo Pinto | 5,395 | -3,425 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,174 | 5,194 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 285 | 12.25 | 200 S |
| 4.5 | 5,401 | 7.875 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 4, 2013 | Jan 11, 2012 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-081-32005 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-081-32005 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/08132005, documented in the API reference.