WELL · 42-083-30652 · DISTRICT 7
Morrow Joe Paul #1
Coleman County · Santa Anna (Marble Falls) field · Vertical
Morrow Joe Paul #1 (API 42-083-30652) is a plugged well in Coleman County, plugged February 15, 2005, last operated by Lane Operating.
The RRC has issued one drilling permit, issued January 11, 1978, permitted to 2,200 ft.
It was permitted by Subsurface Energy Corp. and has since transferred to Lane Operating on the wellbore schedule.
Operator of record
Permitted by Subsurface Energy Corp.; the EWA schedule now lists a different operator.
Santa Anna, TX · P-5 Y, filed Jan 8, 2010
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Lane Operating |
| Production reports | none |
| Latest permit | Subsurface Energy Corp.Jan 11, 1978 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,200
- total depth, ft
- 1
- permits on file
- Jan 11, 1978
- last permit issued
- Mar 16, 1979
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2005
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 16, 1979
- Shut in
- —
- Plugged
- Feb 15, 2005
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Morrow, Joe Paul G-8-82025 | Santa Anna (Marble Falls) | Lane Operating | 1 | 0 | 0 | Jan 1993 – Feb 2005 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 16132-99 | Other | Subsurface Energy Corp. | Jan 11, 1978 | Jan 11, 1978 | Jan 16, 1978 | 2,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-82025 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,069 | 2,076 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 182 | 11 | — |
| 2.375 | 2,025 | — | — |
| 4.5 | 2,192 | 7.875 | 420 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | May 25, 1979 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-083-30652 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-083-30652 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/08330652, documented in the API reference.