WELL · 42-083-33558 · DISTRICT 7
Babston Heirs #1
Coleman County · Hrubetz (Ellen) field · Vertical
Babston Heirs #1 (API 42-083-33558) is a well in Coleman County operated by Novo Energy Corporation, completed September 12, 1983.
The RRC has issued 2 drilling permits between 1983 and 1984, permitted to 4,700 ft.
Completion filings report 3 formation tops, including Gray, Caddo, Ellenburger.
Its lease has reported 35.6K barrels of oil and 21 mcf of gas since January 1993, last reporting in July 2026.
Operator of record
Fort Worth, TX · P-5 Y, filed Jun 13, 1986 · 16 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Novo Energy Corporation |
| Production reports | 3 S Production, Inc.through Apr 2026 |
| Latest permit | Novo Energy CorporationJun 27, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,700
- total depth, ft
- 2
- permits on file
- Jun 27, 1984
- last permit issued
- Sep 12, 1983
- completed
- 35.6K
- cumulative oil, bbl
- 21
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 12, 1983
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Babston Heirs O-8-21311 | Jim Ned | 3 S Production, Inc. | 1 | 35.6K | 21 | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 597 · prior 12 679(-12%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Novo Exploration CorporationJan 1993 → Aug 2011
- 2Viathon Hydrocarbons, Inc.Sep 2011 → Oct 2020
- 33 S Production, Inc.Nov 2020 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 243388-99 | Recompletion | Novo Energy Corporation | Jun 26, 1984 | Jun 27, 1984 | — | 4,430 |
| 196498-99 | Drill | Novo Energy Corporation | May 26, 1983 | May 26, 1983 | — | 4,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-21311 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,995 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Gray | 3,905 | -1,910 |
| Caddo | 4,088 | -2,093 |
| Ellenburger | 4,450 | -2,455 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,906 | 3,912 | Perforated |
| 4,461 | 4,478 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 132 | 11 | 85 S |
| 2.375 | 4,483 | — | — |
| 4.5 | 4,756 | 7.875 | 225 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 13, 1984 | Jun 26, 1984 | — |
| 00 | Jul 6, 1984 | Jun 26, 1984 | — |
| 00 | Jan 12, 1984 | Sep 21, 1983 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-083-33558 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-083-33558 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/08333558, documented in the API reference.