WELL · 42-083-33962 · DISTRICT 7
Moore Lelia J. #4
Coleman County · Santa Anna (Marble Falls) field · Vertical
Moore Lelia J. #4 (API 42-083-33962) is a plugged well in Coleman County, plugged May 20, 2025, last operated by Santa Anna Operating 3 LLC.
The RRC has issued one drilling permit, issued February 8, 1984, permitted to 2,990 ft.
It was permitted by Dominy Oil CO., Inc. and has since transferred to Santa Anna Operating 3 LLC on the wellbore schedule.
Completion filings report 5 formation tops, including Home, Adams, Fry, Caddo.
Operator of record
Permitted by Dominy Oil Co., Inc.; the EWA schedule now lists a different operator.
Santa Anna, TX · P-5 Y, filed Aug 4, 2025 · (325) 642-6453
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Santa Anna Operating 3 LLC |
| Production reports | Santa Anna Operating 3, LLCthrough Dec 2022 |
| Latest permit | Dominy Oil Co., Inc.Feb 8, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,990
- total depth, ft
- 1
- permits on file
- Feb 8, 1984
- last permit issued
- Aug 3, 1984
- completed
- 0
- cumulative oil, bbl
- 52.6K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2025
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 3, 1984
- Shut in
- —
- Plugged
- May 20, 2025
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Moore, Lelia J. G-8-114701 | Santa Anna (Marble Falls) | Santa Anna Operating 3, LLC | 1 | 0 | 52.6K | Jan 1993 – May 2025 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Dominy Oil Co., Inc.Jan 1993 → Oct 1999
- 2WJH Energy, Inc.Nov 1999 → Dec 2016
- 3Santa Anna Operating Co I, LLCJan 2017 → Oct 2018
- 4Santa Anna Operating 3, LLCNov 2018 → Dec 2022
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 228587-99 | Drill | Dominy Oil Co., Inc. | Jan 27, 1984 | Feb 8, 1984 | — | 2,990 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-114701 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Download CSV →
| Formation | MD ft |
|---|---|
| Home | 510 |
| Adams | 850 |
| Fry | 1,580 |
| Caddo | 1,758 |
| Caddo | 1,759 |
| Marble Falls | 2,222 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,225 | 2,278 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 168 | 11 | 120 S |
| 4.5 | 2,331 | 7.875 | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 28, 1985 | Jan 28, 1985 | — |
| 00 | Feb 8, 1985 | Dec 26, 1984 | — |
| 00 | Sep 19, 1984 | Aug 9, 1984 | — |
| 00 | Sep 15, 1984 | Aug 9, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-083-33962 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-083-33962 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/08333962, documented in the API reference.