WELL · 42-083-34074 · DISTRICT 7

J.R. Ranch #1

Plugged

Coleman County · Traci (Morris) field  · Vertical

J.R. Ranch #1 (API 42-083-34074) is a plugged well in Coleman County, plugged June 4, 1985, last operated by Grimes Erwin E..

The RRC has issued one drilling permit, issued May 11, 1984, permitted to 3,100 ft.

It was permitted by Fargo Exploration CO. and has since transferred to Grimes Erwin E. on the wellbore schedule.

Completion filings report one formation top, including Morris.

Operator of record

Grimes Erwin E.

Permitted by Fargo Exploration Co.; the EWA schedule now lists a different operator.

Kerrville, TX · P-5 Y, filed Feb 1, 2002 · 9 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGrimes Erwin E.
Production reportsnone
Latest permitFargo Exploration Co.May 11, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,100
total depth, ft
1
permits on file
May 11, 1984
last permit issued
Nov 2, 1984
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 2, 1984
Shut in
—
Plugged
Jun 4, 1985

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
238510-99DrillFargo Exploration Co.May 7, 1984May 11, 1984May 21, 19843,100

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Morris2,540

Perforations

Perforated and open-hole intervals.

FromToType
2,5402,552Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251071190 S
4.52,9927.875125 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 11, 1985Nov 29, 1984—
00Jan 4, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/08334074, documented in the API reference.