WELL · 42-083-34100 · DISTRICT 7

McDaniels #2

Plugged

Coleman County · Whitt (Caddo Middle) field  · Vertical

Mcdaniels #2 (API 42-083-34100) is a plugged well in Coleman County, plugged September 14, 1987, last operated by Coleman County Project.

The RRC has issued one drilling permit, issued February 28, 1984, permitted to 1,999 ft.

It was permitted by Locker Petroleum and has since transferred to Coleman County Project on the wellbore schedule.

Completion filings report 2 formation tops, including Fry, Caddo.

Operator of record

Coleman County Project

Permitted by Locker Petroleum; the EWA schedule now lists a different operator.

Coleman, TX · P-5 Y, filed Jul 6, 2012

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleColeman County Project
Production reportsnone
Latest permitLocker PetroleumFeb 28, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,999
total depth, ft
1
permits on file
Feb 28, 1984
last permit issued
Apr 5, 1984
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 5, 1984
Shut in
—
Plugged
Sep 14, 1987

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
230635-99DrillLocker PetroleumFeb 24, 1984Feb 28, 1984—1,999

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Fry514
Caddo656

Perforations

Perforated and open-hole intervals.

FromToType
684704Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.58556.75180 sx

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 22, 1984Apr 30, 1984—
00May 11, 1984Apr 30, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/08334100, documented in the API reference.