WELL · 42-083-34169 · DISTRICT 7

North E. Kemp #1

Plugged

Coleman County · Coleman County Regular field  · Vertical

North E. Kemp #1 (API 42-083-34169) is a plugged well in Coleman County, plugged October 21, 1991, last operated by Heart Land Petroleum Corporation.

The RRC has issued one drilling permit, issued August 3, 1984, permitted to 4,999 ft.

It was permitted by Inter America Minerals, Inc. and has since transferred to Heart Land Petroleum Corporation on the wellbore schedule.

Completion filings report 6 formation tops, including Palo Pinto, Dog Bend Lime, Morris Sand, Lower Fry Sand.

Operator of record

Heart Land Petroleum Corporation

Permitted by Inter America Minerals, Inc.; the EWA schedule now lists a different operator.

Abilene, TX · P-5 Y, filed Apr 6, 2023 · 95 permits on file · (325) 660-3655

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHeart Land Petroleum Corporation
Production reportsnone
Latest permitInter America Minerals, Inc.Aug 3, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,999
total depth, ft
1
permits on file
Aug 3, 1984
last permit issued
Feb 28, 1985
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 28, 1985
Shut in
—
Plugged
Oct 21, 1991

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
— O-8-22383——000—

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
247198-99DrillInter America Minerals, Inc.Jul 26, 1984Aug 3, 1984—4,999

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-22383————

Formation tops

As filed on W-2/G-1. Subsea from 1,994 ft elevation.Download CSV →

FormationMD ftSubsea
Palo PintoPALO PINTO LIME2,995-1,001
Dog Bend Lime3,158-1,164
Morris Sand3,236-1,242
Lower Fry Sand3,380-1,386
Jennings Sand3,404-1,410
CaddoCADDO LIME3,718-1,724

Perforations

Perforated and open-hole intervals.

FromToType
3,3043,310Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62516512.25150 S
4.54,4217.875400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 1, 1985Apr 15, 1985—
00Apr 30, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/08334169, documented in the API reference.