WELL · 42-083-34279 · DISTRICT 7

Loudamy #2

Plugged

Coleman County · Lynx-Aguilar (Morris) field  · Vertical

Loudamy #2 (API 42-083-34279) is a plugged well in Coleman County, plugged December 22, 1987, last operated by Lynx Oil CO. Inc..

The RRC has issued one drilling permit, issued November 5, 1984, permitted to 3,500 ft.

Completion filings report one formation top, including Morris.

Operator of record

Lynx Oil Co. Inc.

Denton, TX · P-5 Y, filed Sep 5, 2003 · 48 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLynx Oil Co. Inc.
Production reportsnone
Latest permitLynx Oil Co., Inc.Nov 5, 1984
3,500
total depth, ft
1
permits on file
Nov 5, 1984
last permit issued
Dec 1, 1984
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 1, 1984
Shut in
—
Plugged
Dec 22, 1987

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
256745-99DrillLynx Oil Co., Inc.Nov 5, 1984Nov 5, 1984—3,500

Formation tops

As filed on W-2/G-1. Subsea from 1,958 ft elevation.Download CSV →

FormationMD ftSubsea
Morris2,955-997

Perforations

Perforated and open-hole intervals.

FromToType
2,9552,962Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62525312.25210 S
4.53,4037.875190 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 7, 1985Dec 27, 1984—
00Feb 6, 1985Dec 10, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/08334279, documented in the API reference.