WELL · 42-083-34353 · DISTRICT 7

Lavelle #9

N

Coleman County  · Vertical

Lavelle #9 (API 42-083-34353) is a former disposal or injection well in Coleman County, last operated by Raw Energy Corporation; its UIC permit is no longer active.

The RRC has issued 2 drilling permits between 1983 and 1985, permitted to 4,500 ft.

Completion filings report 5 formation tops, including Palo Pinto, Morris, Gardner, Gray.

Its 3 leases have reported 277K barrels of oil and 219K mcf of gas since January 1993, last reporting in July 2026. The leases carry 24 wells, so these are lease totals, not this well alone.

Operator of record

Raw Energy Corporation

Weatherford, TX · P-5 Y, filed Jun 3, 1992 · 276 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsPony Express Corporate Trustthrough Aug 2024
Latest permitRaw Energy CorporationJan 18, 1985
4,500
total depth, ft
2
permits on file
Jan 18, 1985
last permit issued
—
completed
277K
cumulative oil, bbl
219K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 24 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lavelle-Smith Unit O-8-28847Lake Coleman (Morris 2750)Pony Express Corporate Trust17241K72.2KSep 2000 – Jul 2026
Lavelle O-8-20558Lake Coleman (Morris 2750)Encon Services, Inc.735.8K147KJan 1993 – Mar 2008
— G-8-116082——000—

Oil, barrels lease total

Last 12 months 0 · prior 12 8(-100%)

0204060202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Dynamic Production, Inc.Jan 1993 → Jun 1999
  2. 2Encon Services, Inc.Jul 1999 → May 2011
  3. 3Contour Oil & Gas, LLCJun 2011 → Nov 2015
  4. 4D.J. & T. EnergyDec 2015 → Mar 2023
  5. 5Pony Express Corporate TrustApr 2023 → Aug 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
264481-99DrillRaw Energy CorporationJan 15, 1985Jan 18, 1985Mar 7, 19854,000
217040-99DrillRaw Energy CorporationAug 31, 1983Oct 13, 1983—4,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-8-116082————
—— O-8-20558————
—— O-8-28847————

Formation tops

As filed on W-2/G-1. Subsea from 1,879 ft elevation.Download CSV →

FormationMD ftSubsea
Palo Pinto2,535-656
Morris2,850-971
Gardner3,170-1,291
Gray3,370-1,491
Caddo3,465-1,586

Perforations

Perforated and open-hole intervals.

FromToType
2,8502,854Perforated
2,8502,855Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62512112.25125 S
8.62513112.25125 S
8.62513112.5125 S
4.52,9457.875175 S
4.52,9507.875175 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 26, 2000Jul 19, 2000Yes
00Aug 31, 2000Jul 19, 2000Yes
00May 1, 1998Feb 25, 1998—
00Apr 3, 1998Feb 20, 1998—
00Jan 13, 1993Dec 16, 1992—
00Dec 23, 1992——
00Sep 26, 1986Sep 3, 1986—
00May 8, 1985Apr 17, 1985—
00May 7, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

24.7K
bbl, last 12 reported months
98.6K
bbl, all reported
Mar 2005
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000059835H-1 InjectionPlugged Jun 20, 20056001,4002,850–2,854

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 24,707 · prior 12 19,640(+26%)

02K4K6K20042005

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/08334353, documented in the API reference.