WELL · 42-083-34497 · DISTRICT 7

Barr #1

Plugged

Coleman County · Maxwell (Morris Sand) field  · Vertical

Barr #1 (API 42-083-34497) is a plugged well in Coleman County, plugged March 3, 1988, last operated by Barr Lease Group.

The RRC has issued one drilling permit (amended once), issued June 25, 1985, permitted to 2,600 ft.

Completion filings report 5 formation tops, including Babbington Sand, Morrris Sand, Winchell Lime, Jennings Sand.

Operator of record

Barr Lease Group

Abilene, TX · P-5 Y, filed Mar 1, 1996 · 1 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBarr Lease Group
Production reportsnone
Latest permitA.D.H. Operating Co.Jun 25, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,600
total depth, ft
2
permits on file
Jun 25, 1985
last permit issued
Jul 10, 1985
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 10, 1985
Shut in
—
Plugged
Mar 3, 1988

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
280231-98DrillBarr Lease GroupSep 11, 1987Jun 25, 1985—2,377
280231-99DrillA.D.H. Operating Co.Oct 9, 1985Jun 25, 1985—2,600

Formation tops

As filed on W-2/G-1. Subsea from 1,707 ft elevation.Download CSV →

FormationMD ftSubsea
Babbington Sand1,010697
Morrris Sand2,184-477
Winchell Lime2,184-477
Jennings Sand2,240-533
Gardned Sand2,434-727

Perforations

Perforated and open-hole intervals.

FromToType
2,1882,194Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251001155 S
4.52,3776.75150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 28, 1985Oct 8, 1985—
00Oct 24, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/08334497, documented in the API reference.