WELL · 42-083-34647 · DISTRICT 7

Lee R. #1

Plugged

Coleman County · Coleman County Regular field  · Vertical

Lee R. #1 (API 42-083-34647) is a plugged well in Coleman County, plugged May 19, 1998, last operated by Simpson Oil & Land CO..

The RRC has issued one drilling permit, issued February 25, 1986, permitted to 2,900 ft.

It was permitted by Aries Operating, Inc. and has since transferred to Simpson Oil & Land CO. on the wellbore schedule.

Completion filings report 6 formation tops, including Breckenridge, Winchell, Cross Cut, Lower Capps.

Its lease has reported 2.45K barrels of oil and 21 mcf of gas since January 1993, last reporting in July 1998.

Operator of record

Simpson Oil & Land Co.

Permitted by Aries Operating, Inc.; the EWA schedule now lists a different operator.

Fort Worth, TX · P-5 Y, filed Oct 4, 2025 · 8 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSimpson Oil & Land Co.
Production reportsSimpson Oil & Land Co.through Aug 1996
Latest permitAries Operating, Inc.Feb 25, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,900
total depth, ft
1
permits on file
Feb 25, 1986
last permit issued
Mar 5, 1986
completed
2.45K
cumulative oil, bbl
21
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 1998

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 5, 1986
Shut in
—
Plugged
May 19, 1998

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lee, R. O-8-23607Coleman County RegularSimpson Oil & Land Co.12.45K21Jan 1993 – Jul 1998

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1E.G. OperatingJan 1993 → Apr 1996
  2. 2Simpson Oil & Land Co.May 1996 → Aug 1996

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
298401-99DrillAries Operating, Inc.Apr 3, 1986Feb 25, 1986Feb 27, 19862,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-23607————

Formation tops

As filed on W-2/G-1. Subsea from 1,830 ft elevation.Download CSV →

FormationMD ftSubsea
Breckenridge1,215615
Winchell1,982-152
Cross Cut2,448-618
Lower Capps2,565-735
Jennings2,700-870
Gardner2,753-923

Perforations

Perforated and open-hole intervals.

FromToType
2,4482,466Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62512512.25110 S
4.52,5617.875125 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 25, 1986Mar 31, 1986Yes
00Apr 9, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/08334647, documented in the API reference.