WELL · 42-083-34702 · DISTRICT 7

Johnson #4

Plugged

Coleman County · Coleman County Regular field  · Vertical

Johnson #4 (API 42-083-34702) is a plugged well in Coleman County, plugged December 3, 1987, last operated by Advance Exploration.

The RRC has issued one drilling permit, issued July 25, 1986, permitted to 1,000 ft.

Completion filings report one formation top, including Amarada Sand.

Operator of record

Advance Exploration

Abilene, TX · P-5 Y, filed May 2, 2025 · 21 permits on file · (325) 320-1524

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAdvance Exploration
Production reportsnone
Latest permitAdvance ExplorationJul 25, 1986
1,000
total depth, ft
1
permits on file
Jul 25, 1986
last permit issued
Apr 1, 1987
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 1, 1987
Shut in
—
Plugged
Dec 3, 1987

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
304555-99DrillAdvance ExplorationJul 24, 1986Jul 25, 1986—1,000

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Amarada Sand397

Perforations

Perforated and open-hole intervals.

FromToType
397380Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.53807.875100 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 30, 1987Apr 6, 1987Yes
00Apr 14, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/08334702, documented in the API reference.