WELL · 42-083-34765 · DISTRICT 7
Wright Billie #2
Coleman County · Momac (Morris) field · Vertical
Wright Billie #2 (API 42-083-34765) is a plugged well in Coleman County, plugged June 12, 1995, last operated by Gould Energy CO..
The RRC has issued one drilling permit, issued December 11, 1986, permitted to 3,800 ft.
It was permitted by Hutchco Production, Inc. and has since transferred to Gould Energy CO. on the wellbore schedule.
Completion filings report 5 formation tops, including Morris, Lower Capps, Jennings, Gardner.
Its lease has reported 1.03K barrels of oil and 21 mcf of gas since January 1993, last reporting in August 1995.
Operator of record
Permitted by Hutchco Production, Inc.; the EWA schedule now lists a different operator.
Owasso, OK · P-5 Y, filed Mar 11, 2005 · 8 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Gould Energy Co. |
| Production reports | Gould Energy Co.through Mar 1995 |
| Latest permit | Hutchco Production, Inc.Dec 11, 1986 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,800
- total depth, ft
- 1
- permits on file
- Dec 11, 1986
- last permit issued
- Feb 16, 1987
- completed
- 1.03K
- cumulative oil, bbl
- 21
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 1995
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 16, 1987
- Shut in
- —
- Plugged
- Jun 12, 1995
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Wright, Billie O-8-22089 | Momac (Morris) | Gould Energy Co. | 1 | 1.03K | 21 | Jan 1993 – Aug 1995 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Gould Energy Co.Jan 1993 → Mar 1995
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 324063-99 | Drill | Hutchco Production, Inc. | Dec 8, 1986 | Dec 11, 1986 | — | 3,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-22089 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,942 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Morris | 3,120 | -1,178 |
| Lower Capps | 3,200 | -1,258 |
| Jennings | 3,328 | -1,386 |
| Gardner | 3,339 | -1,397 |
| Gray | 3,578 | -1,636 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,439 | 3,444 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 304 | 11 | 365 S |
| 4.5 | 3,718 | 7.875 | 230 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 2, 1987 | Mar 16, 1987 | Yes |
| 00 | Mar 19, 1987 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-083-34765 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-083-34765 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/08334765, documented in the API reference.