WELL · 42-083-34808 · DISTRICT 7
Barnett #4
Coleman County · Silver Valley field · Vertical
Barnett #4 (API 42-083-34808) is a plugged well in Coleman County, plugged February 18, 1999, last operated by Gould Energy CO..
The RRC has issued one drilling permit (amended once), issued March 18, 1987, permitted to 3,700 ft.
It was permitted by Hutchco Production, Inc. and has since transferred to Gould Energy CO. on the wellbore schedule.
Completion filings report 4 formation tops, including Morris, Gardner, Gray, Caddo.
Its lease has reported 10.4K barrels of oil and 41.8K mcf of gas since January 1993, last reporting in September 1999. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Hutchco Production, Inc.; the EWA schedule now lists a different operator.
Owasso, OK · P-5 Y, filed Mar 11, 2005 · 8 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Gould Energy Co. |
| Production reports | Gould Energy Co.through Jan 1999 |
| Latest permit | Hutchco Production, Inc.Mar 18, 1987 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,700
- total depth, ft
- 2
- permits on file
- Mar 18, 1987
- last permit issued
- Nov 1, 1987
- completed
- 10.4K
- cumulative oil, bbl
- 41.8K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 1999
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 1, 1987
- Shut in
- —
- Plugged
- Feb 18, 1999
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Barnett O-8-11921 | Silver Valley | Gould Energy Co. | 2 | 10.4K | 41.8K | Jan 1993 – Sep 1999 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Gould Energy Co.Jan 1993 → Dec 1998
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 327707-98 | Drill | Hutchco Production, Inc. | Dec 18, 1987 | Mar 18, 1987 | — | 3,660 |
| 327707-99 | Drill | Hutchco Production, Inc. | Mar 13, 1987 | Mar 18, 1987 | — | 3,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-11921 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,909 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Morris | 3,440 | -1,531 |
| Gardner | 3,450 | -1,541 |
| Gray | 3,490 | -1,581 |
| Caddo | 3,668 | -1,759 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,490 | 3,590 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 208 | 12.25 | 135 S |
| 4.5 | 3,690 | 7.875 | 175 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 1, 1988 | Dec 16, 1987 | Yes |
| 00 | Jan 16, 1988 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-083-34808 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-083-34808 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/08334808, documented in the API reference.