WELL · 42-083-34910 · DISTRICT 7

Overall East #1

Plugged

Coleman County · Coleman County Regular field  · Vertical

Overall East #1 (API 42-083-34910) is a plugged well in Coleman County, plugged February 11, 1998, last operated by Chiodo Corp..

The RRC has issued one drilling permit, issued October 29, 1987, permitted to 3,500 ft.

It was permitted by Kinlaw Oil Corporation and has since transferred to Chiodo Corp. on the wellbore schedule.

Completion filings report one formation top, including Ranger Limestone.

Its lease has reported 310 barrels of oil and 2.21K mcf of gas since January 1993, last reporting in November 1999.

Operator of record

Chiodo Corp.

Permitted by Kinlaw Oil Corporation; the EWA schedule now lists a different operator.

San Antonio, TX · P-5 Y, filed Dec 6, 2019 · 10 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleChiodo Corp.
Production reportsChiodo Corp.through Oct 1994
Latest permitKinlaw Oil CorporationOct 29, 1987

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,500
total depth, ft
1
permits on file
Oct 29, 1987
last permit issued
Jan 25, 1988
completed
310
cumulative oil, bbl
2.21K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 1999

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 25, 1988
Shut in
—
Plugged
Feb 11, 1998

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Overall East O-8-24759Coleman County RegularChiodo Corp.13102.21KJan 1993 – Nov 1999

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Powell, A. BrandtJan 1993 → Nov 1993
  2. 2Chiodo Corp.Dec 1993 → Sep 1994

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
338113-99DrillKinlaw Oil CorporationOct 29, 1987Oct 29, 1987—3,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-24759————

Formation tops

As filed on W-2/G-1. Subsea from 1,724 ft elevation.Download CSV →

FormationMD ftSubsea
Ranger Limestone1,65074

Perforations

Perforated and open-hole intervals.

FromToType
2,1462,156Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62512912.25100 S
4.52,3847.875150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 15, 1988Feb 8, 1988Yes
00Mar 4, 1988——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/08334910, documented in the API reference.