WELL · 42-083-35417 · DISTRICT 7

James #2

Plugged

Coleman County · Coleman County Regular field  · Vertical

James #2 (API 42-083-35417) is a plugged well in Coleman County, plugged December 20, 2017, last operated by Blanton Oil LLC.

The RRC has issued one drilling permit, issued November 2, 1994, permitted to 1,999 ft.

It was permitted by Guidance Oil Developers, Inc. and has since transferred to Blanton Oil LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Amerade Sand, Cross Cut Sand.

Its lease has reported 7.66K barrels of oil since September 1994, last reporting in July 2026. The lease carries 4 wells, so these are lease totals, not this well alone.

Operator of record

Blanton Oil LLC

Permitted by Guidance Oil Developers, Inc.; the EWA schedule now lists a different operator.

Allen, TX · P-5 Y, filed Jun 2, 2017 · (325) 370-0879

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBlanton Oil LLC
Production reportsBlanton Oil, LLCthrough Apr 2015
Latest permitGuidance Oil Developers, Inc.Nov 2, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,999
total depth, ft
1
permits on file
Nov 2, 1994
last permit issued
Feb 11, 1996
completed
7.66K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 1994 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 11, 1996
Shut in
—
Plugged
Dec 20, 2017

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
James O-8-27296Coleman County RegularBlanton Oil, LLC47.66K0Sep 1994 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Guidance Oil Developers, Inc.Sep 1994 → May 1995
  2. 2B-W OilJul 1995 → Aug 1995
  3. 3Scranton ExplorationSep 1995 → Mar 2004
  4. 4Ledbetter, Jerald D. Oil CompanyApr 2004 → Jan 2007
  5. 5Ledbetter, Jerald D. Estate OFFeb 2007 → Jun 2013
  6. 6US. Fuels, Inc.Jul 2013 → Oct 2014
  7. 7Blanton Oil, LLCNov 2014 → Apr 2015

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
429562-99DrillGuidance Oil Developers, Inc.Oct 31, 1994Nov 2, 1994Dec 13, 19941,999

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-27296————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Amerade Sand358
Cross Cut Sand1,731

Perforations

Perforated and open-hole intervals.

FromToType
358368Perforated
1,7311,748Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,7316.75240 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 7, 2001Oct 1, 2001—
00Jul 14, 1999Jun 7, 1999—
00Aug 21, 1996Jun 6, 1996—
00May 11, 1995Apr 5, 1995—
00Apr 19, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
71.3K
bbl, all reported
Mar 2016
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000084010H-1 InjectionPlugged Jan 8, 20185008501,731–1,748

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 10,248(-100%)

05001K20152016

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/08335417, documented in the API reference.